Loading...
HomeMy WebLinkAbout0115688 B e OSHKOSH ON THE WATER Job Address 804 VINE AVE CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 115688 Owner PAUL L FREDRICK Create Date 08/09/2005 Designer Contractor WASCO - WISCONSIN ALUMINUM SUPPLY CC Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ---2. Sq. Ft. ---2. Sq. Ft. Rooms 0 Height 0 Ft. D Projection I Finished/Living Bedrooms Stories Canopies ---2. Garage ---2. Sq. Ft. Baths Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 Use/Nature SFRIInstall1 Awning casemetn. and 3 double hung windows in existing openings - NO STRUCTURAL CHANGES! of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $2.115.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Issued By: Date 08/09/2005 Final/D.P. 00/00/0000 D Permit Voided I Parcelld # 0503100000 In the perfonmance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement resbictions of which it is not a party, if you perfonm the work described in this penmit application within an easement. the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 2546 AMERICAN DR AgenUOwner APPLETON WI 54914 - 0000 Telephone Number 920-730-0099 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not perfonmed within two business days from the time the project is ready.