Loading...
HomeMy WebLinkAbout2005-Building (roof) e OSHKOSH ON THE WATER Job Address 819SCHOOLAVE CITY OF OSHKOSH No 115690 BUILDING PERMIT -APPLICATION AND RECORD OWner TRINITY EV LUTH CHURCH Create Date 08/09/2005 Designer Contractor GREAT LAKES ROOFING Category 229 - Alteration Schools & other Educational Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~ Sq. Ft. Rooms 0 Height ~ Ft. Finished/Living ~Sq.Ft. Bedrooms ~ Stories Garage ~ Sq. Ft. Baths 0 D Projection I Canopies Signs Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures ~ UselNature chool/ Reroof. tear off existing membrane. make repairs to deck, insulation and sheeting as required. Intall new EPDM adhered of Work membrane. . Late Permit. HVAC Contractor Plumbing Contractor Electric Contractor Issued By: $70,800.00 Plan Approval $0.00 Penmit Fee Paid $554.00 Park Dedication $0.00 Date 08/09/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0203010000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform tile work described in this permit application witllin an easement, the City strongly urges the permit applicant to contact tile easement holder(s) and to secure any necessáry approvals before starting such activity. Signature Date Address 370 BOWEN ST Agent/Owner OSHKOSH WI 54901 - 5157 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do We gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.