Loading...
HomeMy WebLinkAbout0115686 B e OSHKOSH ON THE WATER Job Address 803 W MURDOCK AVE CITY OF OSHKOSH No 115686 BUILDING PERMIT. APPLICATION AND RECORD OWner PAUL C GIESE Create Date 08/09/2005 Designer Contractor SALZER SIDING Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms Height 0 Ft. D Projection I Canopies 0 Signs Finished/Living Bedrooms Stories Garage ~ Sq. Ft. Baths 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures ~ Use/Nature ¡DUPLEX! Insla1l16 Vinyl replacement windows, cover soffit and fascia, and wrap window openings, and inslall vinyl siding on house and of Work garage. HVAC Contractor Plumbing Contractor Electric Contractor $13,000.00 Plan Approval $0.00 Permit Fee Paid $89.00 Park Dedication $0.00 Fees: Valuation Issued By: Date 08/09/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1211420000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to conlact the easement holder(s) and to secure any necessary approvals before slarting such activity. Signature Date Address PO BOX 825 AgenUOwner OSHKOSH WI 54903 - 0825 Telephone Number (920) 231-5025 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.