Loading...
HomeMy WebLinkAbout2005-Building (wall damage) e OSHKOSH ON THE WATER Job Address 1503 S MAIN ST CITY OF OSHKOSH No 115703 BUILDING PERMIT. APPLICATION AND RECORD Owner CARL SOSNOSKI Create Date 08/09/2005 Designer Contractor PACKER VALLEY BUILDERS, INC Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 Zoning Size Finished/Living ~Sq.Ft. ~Sq.Ft. 0 Projection I Unfinished/Basement Canopies ~ Garage ~ Sq. Ft. Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Not Required Flood Plain ~ # Dwelling Units --9. Height Permit Not Required Occupancy Permit Not Required Park Dedication # Structures 0 Use/Nature Comm / Repair damage to wall of building to include replacement of window, repair of tramming, interior trim and floor covering as a of Work result of vehicie colision with the buiiding. HVAC Contractor Plumbing Contractor Electric Contractor ELECTRIC INC ,700.00 Plan Approval $0.00 Permit Fee Paid $38.00 Park Dedication $0.00 Issued By: Date 08/09/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 0305160000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, City strongly urges the permit applicant to contact the easement holder(s} and to secure ecessa approvals I . g such activity. Date g - C; -c<!7' Signature Y'{L 54904 - 0000 Telephone Number 92()"232-7620 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.