HomeMy WebLinkAbout2005-Building (wall damage)
e
OSHKOSH
ON THE WATER
Job Address 1503 S MAIN ST
CITY OF OSHKOSH
No
115703
BUILDING PERMIT. APPLICATION AND RECORD
Owner CARL SOSNOSKI
Create Date
08/09/2005
Designer
Contractor
PACKER VALLEY BUILDERS, INC
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy 0 Fence 0 Raze
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
Zoning
Size
Finished/Living
~Sq.Ft.
~Sq.Ft.
0 Projection I
Unfinished/Basement
Canopies ~
Garage
~ Sq. Ft.
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Not Required
Flood Plain ~
# Dwelling Units --9.
Height Permit Not Required
Occupancy Permit Not Required
Park Dedication
# Structures
0
Use/Nature Comm / Repair damage to wall of building to include replacement of window, repair of tramming, interior trim and floor covering as a
of Work result of vehicie colision with the buiiding.
HVAC Contractor
Plumbing Contractor
Electric Contractor
ELECTRIC INC
,700.00 Plan Approval
$0.00 Permit Fee Paid
$38.00 Park Dedication
$0.00
Issued By:
Date 08/09/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 0305160000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, City strongly urges the permit applicant to contact the easement
holder(s} and to secure ecessa approvals I . g such activity.
Date g - C; -c<!7'
Signature
Y'{L 54904 - 0000 Telephone Number
92()"232-7620
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.