Loading...
HomeMy WebLinkAbout0115685-Building (exterior) e OSHKOSH ON THE WATER Job Address 1207 MAGNOLIA AVE CITY OF OSHKOSH No 115685 BUILDING PERMIT - APPLICATION AND RECORD OWner JIM WITZKE Create Date 08/09/2005 Designer Contractor TOP TO BOTTOM HOME IMPROVEMENT Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 D Projection I Finished/Living Canopies Garage ~ Sq. Ft. Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures 0 Use/Nature Mobile Home/Installing 14 replacement windows, 2 exterior doors, and re-roofing the mobile home (tear off). Installing aluminum fascia of Work nd sottiton the gable ends. HVAC Contractor Plumbing Contractor Electric Contractor Fees: valuW Issued By: $11,704.00 Plan Approval $0.00 Permit Fee Paid $84.00 Park Dedication $0.00 Date 08/09/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1307310100 In the perfonmance of this work I agree to perform all work pursuant to rules govemlng the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work described in this p . plication wi an easement, the City strongly urges the penmit applicant to contact the easement :~~~~::: and to s ""re necessa pprovals befo starting such activity. r '3,/1,J¿ Agent/Owner FOND DU LAC ~ 54935 - 0000 Telephone Number 929-9414 Address To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.