HomeMy WebLinkAbout0115689-Building (windows)
e
OSHKOSH
ON THE WATER
Job Address 849 GRACELAND DR
CITY OF OSHKOSH
No
115689
BUILDING PERMIT - APPLICATION AND RECORD
Owner STANLEY E/ALICE BUHROW
Create Date
08/09/2005
Designer
Contractor
WASCO - WISCONSIN ALUMINUM SUPPLY C(
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
~Sq.Ft.
~ Sq. Ft.
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
0 Pier 0 Other
0 Treated Wood
0 Projection I
Finished/Living
Canopies
Garage
~Sq.Ft.
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
Occupancy Permit Not Required
Flood Plain ~
# Dwelling Units 0
Height Permit Not Required
Park Dedication
Not Required
# Structures
0
Use/Nature SFRIlnstall 2 double hung vinyl replacement windows in their existing openings.
ofWork
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$1,178.00 Plan Approval
$0.00 Permit Fee Paid
$26.00 Park Dedication
$0.00
Issued By:
Date 08/09/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 0617340000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 2546 AMERICAN DR
Agent/Owner
APPLETON
WI 54914 - 0000
Telephone Number
920-730-0099
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number, Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.