HomeMy WebLinkAbout0115699-Building (foundation repair)
~
OSHKOSH
ON THE WATER
Job Address 1050 COOLIDGE AVE
CITY OF OSHKOSH
No
115699
BUILDING PERMIT - APPLICATION AND RECORD
Owner JEFFERY UKELL Y LANGKAU
Create Date
0810912005
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft.
FinishedlLiving ~Sq.Ft. Bedrooms 0 Stories
Garage ~ Sq. Ft. Baths 0
0 Projection I
Canopies
Signs
Foundation
. Poured Concrete 0 Fioating Siab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
~
UseJNature SFRI Excavate along outside of foundation and straighten and wall. Owner assumes responsibilty for ail work to be done to comply with
of Work þpplicable codes and structural requirements.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$50.00 Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Issued By:
T1
Date 0810912005
FinaIID.P. 0010010000
0 Permit Voided I
Parcelld # 1607270000
In the performance of this work i agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessa ppro Is before starting such activity.
Signature ><::.-1'
Date X 8- 9 - (J5""
WI 54902 - 3434
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.