HomeMy WebLinkAbout0115687-Building (siding)
0
OSHKOSH
ON THE WATER
Job Address 337 W 15TH AVE
CITY OF OSHKOSH
BUILDING PERMIT. APPLICATION AND RECORD
No
115687
Owner MARL YN M DOBBERKE
Create Date
0810912005
Contractor
SALZER SIDING
Designer
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy 0 Fence 0 Raze
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms Stories
Baths 0
Size
Zoning
Finished/Living
~Sq.Ft.
~ Sq. Ft.
D Projection I
Unfinished/Basement
Canopies ~
Garage
~Sq.Ft.
Signs
0
Foundation
. Poured Concrete 0 Fioating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units 0
# Structures
----'!
Use/Nature SFRIlnstaii vinyl siding on 2 sides of house, instaii 8 vinyl replacement windows, wrap openings, and cover soffit and fascia.
ofWork
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$5,500.00 Plan Approval
$0,00 Permit Fee Paid
$50.00 Park Dedication
$0,00
Issued By:
Date 08109/2005
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 090465O000
In the performance of this work I agree to perform aii work pursuant to rules governing the described construction,
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongiy urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address PO BOX 825
Agent/Owner
OSHKOSH
WI 54903 - 0825
Telephone Number
(920)231-5025
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.