Loading...
HomeMy WebLinkAbout0115687-Building (siding) 0 OSHKOSH ON THE WATER Job Address 337 W 15TH AVE CITY OF OSHKOSH BUILDING PERMIT. APPLICATION AND RECORD No 115687 Owner MARL YN M DOBBERKE Create Date 0810912005 Contractor SALZER SIDING Designer Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms Stories Baths 0 Size Zoning Finished/Living ~Sq.Ft. ~ Sq. Ft. D Projection I Unfinished/Basement Canopies ~ Garage ~Sq.Ft. Signs 0 Foundation . Poured Concrete 0 Fioating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures ----'! Use/Nature SFRIlnstaii vinyl siding on 2 sides of house, instaii 8 vinyl replacement windows, wrap openings, and cover soffit and fascia. ofWork HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $5,500.00 Plan Approval $0,00 Permit Fee Paid $50.00 Park Dedication $0,00 Issued By: Date 08109/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 090465O000 In the performance of this work I agree to perform aii work pursuant to rules governing the described construction, While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongiy urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 825 Agent/Owner OSHKOSH WI 54903 - 0825 Telephone Number (920)231-5025 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.