HomeMy WebLinkAbout0115675-Plumbing
e
OSHKOSH
ON THE WATER
Job Address 1623 KENTUCKY ST
Contractor J RASMUSSEN PLUMBING INC
Bathtub 0
Whirlpool 0
Lavatory 0
Toilet 0
Res. Sink 1
Bar Sink 0
Water Heater 0
Site Drain 0
Roof Drain 0
Misc. 0
Fixtures
Use/Nature
ofWork
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
CITY OF OSHKOSH
No
115675
Owner RONALD J SPALDING
Category 410 - Residential-Interior
0
0
0
0
0
0
0
0
0
Wait.S!.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
PLUMBING PERMIT. APPLICATION AND RECORD
Plan Approval
$0.00
0
~
~
1
~
0
~
~
~
WaterSoftner
Local Waste
Clothes Wshr
Bidet
Beer Tap
Lab Sink
Create Date 08/08/2005
Plan
0
0
0
0
0
0
0
0
0
Shamp Sink ~
FlrlWstSink 0
Catch Basin 0
Wash Ftn 0
Urinal 0
Standp Rec 0
Ice Maker 0
Gar Drain 0
Soda Disp 0
Coffee Maker 0
Int Grease Trap 0
Ext Grease Trap 0
RPZValve 0
Eye Wash Statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
Sterilizer
Dip Well
Drink Ftn
Install replacement kitchen sink with disposal (Debit Account)
Size Material Type # Conn. Type
Sanitary Sewer 0
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 0
0
0
0 Parcelld #
0 1501790000
Valuation
$800.00
Issued By
Permit Fees
$20.00 0 Permit Voided I
Date 08108/2005
In the performance of this work. I agree to perform all work pursuant to ruies governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement hoider(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 1914 GREENBRiAR TRL
Telephone Number 920-233-6747
AgenVOwner
OSHKOSH
WI 54904 - 0000
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.