Loading...
HomeMy WebLinkAbout0115669-Building (foundation) ~ OSHKOSH ON THE WATER Job Address 1228 W 12TH AVE CITY OF OSHKOSH No 115669 BUILDING PERMIT - APPLICATION AND RECORD Owner DEE D/NICKIE S DURANT Create Date 08/08/2005 Designer Contractor SURE-DRY-BASEMENT SYSTEMS INC Category 141 - Exterior Remodeling Plan Type . Building a Sign a Canopy Class of Const: a Fence a Raze Zoning Size Unfinished/Basement ------.2. Sq. Ft. Rooms 0 Height 0 Ft. Finished/Living ------.2. Sq. Ft. Bedrooms Stories Garage ------.2. Sq. Ft. Baths 0 0 Projection I Canopies 0 Signs ------.2. Foundation . Poured Concrete a Floating Slab a Concrete Block a Post a Pier a Treated Wood a Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures ~ Use/Nature ofWork FR/ Installing 5 grip tite wall anchors. a super sump pit, and excavating along the east entrance foundation wall. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Val~ati,\,\". Issued By: ~'- $4,807.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 Date 08/08/2005 FinaUO.P. 00/00/0000 0 PennitVoided I Pareelld # 1308300000 In the perfonnance of this work I agree to perfonn all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonn the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signatur~fiip"'.Á.j4. ~A~/ AgenUOWner Address 754 W AIRPORT RD MENASHA WI 54952 - 1409 Telephone Number Date To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc,), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready,