Loading...
HomeMy WebLinkAbout0115614-Building (raze warehouse) ~ OSHKOSH ON THE WATER Job Address 530 BAY SHORE DR CITY OF OSHKOSH No 115614 BUILDING PERMIT -APPLICATION AND RECORD Owner HOOPER COMMUNITY CENTER INC Create Date 08105/2005 Designer Contractor RADTKE CONTRACTORS INC. Category 162 - Wrecking Residential Accessory Structures Plan Type . Building 0 Sign 0 Canopy Class of Const: 0 Fence 0 Raze Zoning Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms 0 Stories Garage ~Sq.Ft. Baths 0 D Projection I Canopies 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures ~ Use/Nature COMM/ Razing the existing warehouse shed/building (approx size 24'x180'). The building does not contain piumbing. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees Valuatoon $6,000.00 Plan Approval : ~V.. r¡ I Issued By: iVIJv-- $0.00 Permit Fee Paid $50.00 Park Dedication $0.00 Date 08105/2005 Final/D.P. 00/00/0000 D Permit Voided I Parcelld # 0801150000 In the performance of this work I agree to perfonn all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonn the work described in this permit appiication within an easement, the City strongly urges the pennit applicant to contact the easement holder(s) and to secure any necessary approvais before starting such activity. Signature Date Address 6408 HY 110 AgenUOwner WINNECONNE WI 54986 - 0000 Telephone Number 5824114 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.