HomeMy WebLinkAbout0115614-Building (raze warehouse)
~
OSHKOSH
ON THE WATER
Job Address 530 BAY SHORE DR
CITY OF OSHKOSH
No
115614
BUILDING PERMIT -APPLICATION AND RECORD
Owner HOOPER COMMUNITY CENTER INC
Create Date
08105/2005
Designer
Contractor
RADTKE CONTRACTORS INC.
Category
162 - Wrecking Residential Accessory Structures
Plan
Type
. Building
0 Sign
0 Canopy
Class of Const:
0 Fence
0 Raze
Zoning
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms 0 Stories
Garage ~Sq.Ft. Baths 0
D Projection I
Canopies 0
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
~
Use/Nature COMM/ Razing the existing warehouse shed/building (approx size 24'x180'). The building does not contain piumbing.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees Valuatoon $6,000.00 Plan Approval
: ~V.. r¡ I
Issued By: iVIJv--
$0.00 Permit Fee Paid
$50.00 Park Dedication
$0.00
Date 08105/2005
Final/D.P. 00/00/0000
D Permit Voided I
Parcelld # 0801150000
In the performance of this work I agree to perfonn all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonn the work
described in this permit appiication within an easement, the City strongly urges the pennit applicant to contact the easement
holder(s) and to secure any necessary approvais before starting such activity.
Signature
Date
Address 6408 HY 110
AgenUOwner
WINNECONNE
WI 54986 - 0000 Telephone Number
5824114
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.