Loading...
HomeMy WebLinkAbout0115590 P e OSHKOSH ON THE WATER Job Address 3841 WESTERN DR CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 115590 OWner ANN G LAMAY Create Date 08/04/2005 Contractor GARTMAN MECHANICAL Category 411 - Residential-Water Heaters Plan Bathtub 0 Shower 0 Water Softner ~ Wait St. 0 Shamp Sink ~ Coffee Maker 0 Whirlpool ~ Floor Drain 0 Local Waste ~ Ice Chest 0 FlrlWst Sink 0 Int Grease Trap 0 Lavatory ~ Lndry Tray ~ Clothes Wshr ~ Exam Sink 0 Catch Basin ~ Ext Grease Trap 0 Toilet 0 Disposal ~ Bidet ~ Sculry Sink 0 Wash Ftn 0 RPZValve 0 Res. Sink ~ Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal ~ Eye Wash Statn 0 Bar Sink 0 Sump Pump ~ Lab Sink ~ PlasterSink 0 Standp Rec ~ Wtr Sewer Mtrs 0 Water Heater 1 Classrm Sink ~ Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0 Site Drain 0 Breakrm Sink ~ DipWell ~ F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0 Roof Drain ~ Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp ~ Misc. 0 Fixtures Use/Nature of Work Valuation Issued By Install replacement water heater (Debit Account) Size Material Type # Conn. Type Sanitary Sewer 0 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 0 0 0 0 Parcelld # 0 1261060100 $700.00 $0.00 $20.00 D Permit Voided I Permit Fees Plan Approval Date 08104/2005 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit appiication within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address 520 W SOUTH PARK AV Date AgenUOWner OSHKOSH WI 54902 - 0000 Telephone Number 920-231-5530 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Penmit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.