Loading...
HomeMy WebLinkAbout0115575-Plumbing (water heater) e CITY OF OSHKOSH No 115575 OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 506 BOYD ST OWner LUCILE M HOPPE Create Date 08/04/2005 Contractor SAMMONS PLUMBING Category 411 - Residential-Water Heaters Plan Bathtub 0 Shower 0 Water Softner 0 Wail.SI. 0 Shamp Sink 0 Coffee Maker 0 Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Int Grease Trap 0 Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin -----'! Ext Grease Trap 0 Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn -----'! RPZValve 0 Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec -----'! Wtr Sewer Mtrs 0 Water Heater 1 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0 Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Gar Drain -----'! Wtr Usage Mtrs 0 Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Misc. 0 Fixtures Use/Nature ofWork Valuation Issued By Install replacement water heater (Debit Account) Size Material Type # Conn. Type Sanitary Sewer 0 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 0 0 0 0 Parcelld # 0 1100310000 $600.00 $0.00 $20.00 D Permit Voided I Permit Fees Plan Approval Date 08104/2005 In the performance of this work. I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Address 522W.MURDOCKAVE Signature Date AgenUOwner OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.