HomeMy WebLinkAbout0115555 P
~
OSHKOSH
ON THE WATER
Job Address 1048 TAFT AVE
Contractor KIENAST L G UTILITY CONSTRUCTiON
CITY OF OSHKOSH
No
115555
PLUMBING PERMIT. APPLICATION AND RECORD
Owner GARY L SCHROEDER
Category 401 - Residential-Exterior (laterals)
Create Date 08/03/2005
Plan
Bathtub 0 Shower 0 Water Softner 0 Wail.SI. 0
Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0
Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0
Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0
Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0
Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0
Water Heater 0 Classon Sink 0 Sterilizer 0 Surgeons Sink 0
Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0
Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0
Misc. 0
Fixtures
UseJNature r"~~~~-'
of Work
Size Material Type
Sanitary Sewer Iron Lateral
Shamp Sink ~
FlrlWst Sink 0
Catch Basin 0
Wash Ftn 0
Urinal 0
Standp Rec 0
Ice Maker 0
Gar Drain 0
Soda Disp 0
Coffee Maker ~
Int Grease Trap ~
Ext Grease Trap ~
RPZ Valve 0
Eye Wash Statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
in the perfonnance of this work. I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perfonn the work
described in this permit application within an easement, the City strongly urges the pennit applicant to contact the
easement holder(s) and 0 se any ne saf)f approvals before starting such activity.
~ ~
Storm Sewer
Water Service
lead
Lateral
Valuation
Penmit Fees
$0.00
Plan Approval
Issued By
Signature
Address 765 N WASHBURN
OSHKOSH
~ 54904 - 0000 Telephone Number
#
Conn. Type
1 Aband
0
0
0
0
0
0
0
0
0
1 Aband
0
0
0
0
$100.00 D PennitVoided I
Parcelld #
1606560000
Date 08/03/2005
Date
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.