HomeMy WebLinkAbout0115519 B
~ CITY OF OSHKOSH No 115519
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 641 OTTER AVE Owner SIDNEY J/LORETT STAMPER Create Date 08/0212005
Designer
Contractor
IMPRESSIVE ROOFING AND SIDING INC
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
-~ Sq. Ft.
-~ Sq. Ft.
Rooms
0
Height 0 Ft.
0 Projection I
Canopies --.9.
Finished/Living
Bedrooms 0
Stories
Garage
--.9. Sq. Ft.
Baths
Signs
--.9.
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Requi~
# Dwelling Units 0
# Structures
0
Use/Nature
of Work
FRI Tear-off roofing. install new felt. flashing. vents, and shingles on house only. Install siding on house only, install new gutters and
ownspouts. NO EIV provided - ANY ELECTRICAL WORK REQUIRES AN ELECTRICAL PERMIT
HVAC Contractor
Plumbing Contractor
Electric Contractor
$15,210.44 Plan Approval
$0.00 Permit Fee Paid
$104.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
Date 08/0212005
Final/D.P. 00/00/0000
0 Permit Voided I
Parcel Id # 0801740000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a pany, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address PO BOX 2786
AgenUOwner
APPLETON
WI 54912 - 2786
Telephone Number
232-1669
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.