Loading...
HomeMy WebLinkAbout0115519 B ~ CITY OF OSHKOSH No 115519 OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 641 OTTER AVE Owner SIDNEY J/LORETT STAMPER Create Date 08/0212005 Designer Contractor IMPRESSIVE ROOFING AND SIDING INC Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement -~ Sq. Ft. -~ Sq. Ft. Rooms 0 Height 0 Ft. 0 Projection I Canopies --.9. Finished/Living Bedrooms 0 Stories Garage --.9. Sq. Ft. Baths Signs --.9. Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Requi~ # Dwelling Units 0 # Structures 0 Use/Nature of Work FRI Tear-off roofing. install new felt. flashing. vents, and shingles on house only. Install siding on house only, install new gutters and ownspouts. NO EIV provided - ANY ELECTRICAL WORK REQUIRES AN ELECTRICAL PERMIT HVAC Contractor Plumbing Contractor Electric Contractor $15,210.44 Plan Approval $0.00 Permit Fee Paid $104.00 Park Dedication $0.00 Fees: Valuation Issued By: Date 08/0212005 Final/D.P. 00/00/0000 0 Permit Voided I Parcel Id # 0801740000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a pany, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 2786 AgenUOwner APPLETON WI 54912 - 2786 Telephone Number 232-1669 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.