Loading...
HomeMy WebLinkAbout0115527 B e OSHKOSH ON THE WATER Job Address 5470TTERAVE CITY OF OSHKOSH No 115527 BUILDING PERMIT. APPLICATION AND RECORD OWner CLAIR D ALLEN Create Date 07/25/2005 Designer Contractor WINDOW WORLD OF MILWAUKEE Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ----2. Sq. Ft. ----2. Sq. Ft. Rooms Height 0 Ft. 0 Projection I FinishediLiving Bedrooms 0 Stories Canopies ----2. Garage -~ Sq. Ft. Baths Signs ----2. Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units ----2 # Structures 0 Use/Nature SFRI installing 13 vinyl replacement windows in existing openings - NO STRUCTURAL CHANGES of Work HVAC Contractor Plumbing Contractor Electric Contractor $3,300.00 Plan Approval $0.00 Permit Fee Paid $38.00 Park Dedication $0.00 Fees: Valuation Issued By; Date 0810212005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 0801470100 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 625 FOND DU LAC AVE Agent/Owner FOND DU LAC WI 54935 - 0000 Telephone Number 920-923-4189 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.