Loading...
HomeMy WebLinkAbout0115539-Building (siding) e OSHKOSH ON THE WATER Job Address 1639 IOWA ST CITY OF OSHKOSH No 115539 BUILDING PERMIT. APPLICATION AND RECORD Owner ROBERTNICTORIA FAUST Create Date 0810212005 Contractor OWNER Designer Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ----2. Sq. Ft. ----2. Sq. Ft. Rooms Height 0 Ft. 0 Projection I Finished/Living Bedrooms 0 Stories Canopies ----2. Garage -~ Sq. Ft. Baths Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units ---2 # Structures 0 Use/Nature FR / REPLACING VINYL SIDING ON NORTH & EAST SIDE OIF GARAGE AND NORTH & WEST SIDE OF HOUSE DUE TO FIRE. ofWork NO STRUCTURAL CHANGES. REPLACING 6 WINDOWS, SAME SIZE, SAME LOCATION AND 2 STORM DOORS HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $3,500.00 Plan Approval $0.00 Permit Fee Paid $38.00 Park Dedication $0.00 Issued By: Date 08/0212005 Final/D.P. 00/00/0000 0 Permit Voided I Parcelld # 0908430000 In the perfonmance of this work I agree to perfonm all work pursuant to rules govemln9 the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work described in this penmit application within an easement, the City strongly urges the permit applicant to contact the easement :;~d:~::::nd~~~s~ ~uch activity. Date ,:?;;;-¿J ç {/ C AgenUOwner Address 1639 IOWA ST OSHKOSH WI 54902 - 6807 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.