HomeMy WebLinkAbout0115380 B
e
OSHKOSH
ON THE WATER
Job Address 716 OREGON ST
CITY OF OSHKOSH
No
115380
BUILDING PERMIT - APPLICATION AND RECORD
Owner
716 OREGON STREET LLC
Create Date
07/25/2005
Designer
Contractor
BECK SIGNS
Category
254 - Signs
Plan
Type
10 Building
. Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~ Sq. Ft. Bedrooms 0 Stories
Garage ~ Sq. Ft. Baths 0
U Projection I
Canopies
0
Signs
0
Foundation
0 Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
. Other
Occupancy Permit
Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
0
# Structures
0
Commercial/ Install a 2x6 ilium wall sign on south face and 2x8 ilium wall sign on east face. Both must only advertise on premises businesses.
* Electric permit required if signs are to be energized.
Use/Nature
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$3,800.00
Plan Approval
$0.00 Permit Fee Paid
$38.00 Park Dedication
$0.00
Issued By:
Date 07/25/2005
Final/O.P. 00/00/0000
U Permit Voided I
Parcelld # 0300680200
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
2269 ALLERTON DR
Agent/Owner
OSHKOSH
WI 54904 - 0000 Telephone Number
920-231-1160
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
ÞrOOÆSS -7 t ~ ~ 37', -
~5~ ~ lk~r '7"Ae ~LLW lJo ~(~
Ou»'frlL ~ --&1 fø ~þ c..1-~'
te67 ., ~8ÐDøs
~~~ . ßt:GIL ~~ I~c.
E;-Lel-~JZ-tG. ~701AÞ 'T1-t4-t ~ wwCAtJJ7 ß~"'"
Slo-P: ~ ~: (I\JS7Jtt.l Z- ,,-'" Sf6dS þfoJ ~oJffl Stæ:- S r- J..1i6:
f31fS7 SttJF" ðF- ~"',."'~
,
?~
r.e"1
r
.,
":1'"
;
~@
~
B
\J
I
a.
Þ
,
J
cw
-
-
- ;-
V\
{{lIlt"~"~"~,
~sr.