Loading...
HomeMy WebLinkAbout0115256 P CITY OF OSHKOSH 115256 No OSHKOSHPLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address1568 S OAKWOOD RDOwnerTHOMAS R SCHNUCK/ARLINE MEIERCreate Date07/18/2005 ContractorWATTERS PLUMBINGCategoryPlan 411 - Residential-Water Heaters 0 Water Softner Bathtub0Shower00Wait. St.0Shamp Sink0Coffee Maker 00 WhirlpoolFloor DrainIce ChestFlr/Wst Sink 00Local Waste00Int Grease Trap Clothes Wshr Lavatory0Lndry Tray00Exam Sink0Catch Basin0Ext Grease Trap0 0 ToiletWash Ftn 0Disposal0BidetSculry Sink00RPZ Valve 0 Dishwasher Res. Sink0Beer Tap0Hand Sink0Urinal0Eye Wash Statn 0 0 Bar Sink 0Sump Pump0Lab Sink0Plaster Sink0Standp Rec0Wtr Sewer Mtrs0 Water Heater1Classrm SinkSterilizerSurgeons SinkIce MakerDeduct Meters 00000 Site Drain0Breakrm SinkDip WellF Prep SinkGar DrainWtr Usage Mtrs 0 0000 Drink FtnServ Sink Roof Drain0Ejector/GrindSoda Disp 0000 Misc. 0 Fixtures Use/Nature of Work Install replacement water heater (Debit Account) Bell Electric provided EIV SizeMaterialType#Conn. Type Sanitary Sewer0 0 0 0 0 Storm Sewer0 0 0 0 0 Water Service0 0 0 0 Parcel Id # 0 1320513411 $0.00Permit Voided Valuation$1,350.00Plan ApprovalPermit Fees$20.00 Issued ByDate07/18/2005 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Date Signature Agent/Owner AddressPO BOX 118MENASHAWI54952-0118Telephone Number920-733-8125 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.