HomeMy WebLinkAbout0115237 B
e
OSHKOSH
ON THE WATER
Job Address 641 OTTER AVE
CITY OF OSHKOSH
No
115237
BUILDING PERMIT - APPLICATION AND RECORD
Owner
SIDNEY J/LORETT STAMPER
Create Date
07/18/2005
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
18 Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
0 Sq.Ft.
~ Sq. Ft.
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
U Projection 1
Finished/Living
Canopies
0
Garage
~ Sq. Ft.
Signs
0
Foundation
8 Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
0
# Structures
0
RENT All Removing the existing storm windows on the front and rear enclosed porches and framing them in with new windows. The doors and
1/2 walls will remain. The sill plate will be replaced and new walls built. All windows installed that are located within 2' of the doors will be safety
glass.
Use/Nature
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$1,000.00
Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Issued By:
Date 07/18/2005
Final/O.P. 00/00/0000
U Permit Voided 1
Parcelld # 0801740000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
607 OTTER AVE
Agent/Owner
OSHKOSH
WI 54901 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
I
I
r--6"O"
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
(
I
I
I
I
I
f---6"3"~
;(
¡
'"
1
D.
26"6"
<ÊJ
-~ --------
\>(1Lù1
;;¡I ...,,~.
f---10'0" ..0-
K ----)j
22' 0"
40"0"
;I(
r
1
{,pL( I ()~ <::".'t-
I
T 6",--->1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
I
I
I
I
I
I