Loading...
HomeMy WebLinkAbout0115241-Building (knee wall) CITY OF OSHKOSH No 115241 � ����� OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD '��� , ° ON THE WATER ��' ` Job Address 3001-3015 N MAIN ST Owner DANIEL E DOWLING Create Date 07/18/2005 Designer Contractor DOWLING CONSTRUCTION INC Category 211 -Alteration Industrial Plan Type � Building _ � Sign � Canopy 0 Fence � Raze j Zoning Class of Const: Size Un£nished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. ❑ Projection I Finished/Living 0 Sq.Ft. Bedrooms 0 Stories 1 Canopies 0 Garage 0 Sq.Ft. Baths 0 Signs 0 Foundation � Poured Concrete � Floating Slab � Pier � Other � Concrete Block � Post � Treated Wood Occupancy Permit Not Required Flood Ptain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 - --_ _- Use/Nature ,Industrial/Install a Masonry knee wall on east facade and east 20'of south wall. of Work ; I HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $5,000.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 Issued By: Date 07/18/2005 Final/O.P. 00/00/0000 � Permit Voided� Parcel Id# 1519600502 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the Ciry of Oshkosh has no authoriry to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. Signature Date AgenUOwner Address PO BOX 3045 OSHKOSH WI 54903 - 3045 Telephone Number 235-8021 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address,Permit Number,Type of Inspection(i.e. Footing, Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.