HomeMy WebLinkAboutPW CNT/Riverside Rest/Cng #1
7~
....
CHANGE ORDER NO.1
TO:
CR Meyer & Sons Co.
895 W. 20th Avenue
Oshkosh, WI 54902
Date: June 7, 2005
Your present contract with the City of Oshkosh for construction of the restroom at Riverside Park is
hereby amended and changed as follows:
DEDUCT:
Per the attached letter dated February 14, 2005
$ 87,446.00
Original Contract Amount
Net Change by Change Orders
$661,806.00
( 87.446.00)
$574,360.00
Contract Sum to Date
pment
I certify that provision has been made to
pay the liability that will accrue to the City
of Oshkosh, Wisconsin, under the within
Change Order.
~~IP~~
Finance irector .
-.
..
~
895 W. 20th Avenue, P.O. Box 2157
Oshkosh,VVI54903-2157
(920) 235-3350 Fax (920) 235-3419
February 14, 2005
~NEYEf
Building Solutions Since 1888
Mr. Jackson Kinney
City of Oshkosh
215 E. Church Avenue
Oshkosh, WI 54902
Reference: Riverside Park Restrooms
Dear Mr. Kinney:
We have advertised for, and received numerous quotes for subcontracted items
of work as well as all materials. As a breakdown of the costs for this project, we
hereby submit the following:
. Division 1: Design & Drawings, Management & Supervision,
Temporary Facilities and Services, Equipment, Freight, Bond and
State Submittal Fees.
$38,855.00
. Division 2: Earthwork, Erosion Control, Piling (Includes Winter
Conditions).
$50,521.00
. Division 3: Concrete Foundations and Flatwork (Includes Winter
Conditions).
$60,500.00
. Division 4: Colored, Split-face Concrete Masonry to match leach
Pavilion (Includes Winter Conditions).
$143,640.00
. División 5: Miscellaneous Metals.
$1,082.00
. Division 6: Wood Trusses, Plywood Roof Sheathing, Plywood Ceiling
Sheathing, Plywood Soffits, Wood Sub-fascia, Pine Trim.
$55,906.00
. Division 7: Fiberglas Batt Ceiling Insulation, Colored, Standing Seam
Metal Roof, Metal Soffits, Metal Fascia, Downspouts and Gutters, Attic
Access Hatch, Caulking and Sealants.
$53,424.00
shareUebUetterslriverside park restrooms-1.doc
, il
City of Oshkosh
February 14, 2005
Page - 2
.'
. Division 8: Hollow Metal Door Frames, Hollow Metal Doors, Door
Hardware.
$11,430.00
. Division 9: Gypsum Ceiling, Taping & Finishing Gypsum, Epoxy Paint
on Interior Walls and Ceilings, Masonry Sealer on Exterior.
$27,686.00
. Division 10: Metal Toilet Partitions, Toilet Room Accessories.
$26,682.00
. Division 15: Design, Submittal, and Installation of Ventilation Systems,
Tie-in to Sanitary Sewer and Water Service, 10 Wall-hung Urinals, 42
Floor-mounted Water Closets, 32 Wall-hung lavatories, 2 Floor-
mounted Janitor's Sinks, Floor Drains & Clean-outs, Plumbing Design
and Submittal.
$77,822.00
. Division 16: 2 - 100 amp Three Phase Panels, 24 Interior Light
Fixtures, 12 Power Receptacles, 2 Water Heater Hook-ups, 8
Occupancy Sensors, 10 Exterior Soffit Lights with Dusk to Dawn
Control, 2 Exhaust Fans, Design and Submittal.
TOTAL COST:
$26,812.00
$574,360.00
If we can be of further assistance, please feel free to contact us.
Sincerely,
C. R. MEYER AND SONS COMPANY
~ ~---
f/' Qsrown
Project Manager
cc:
Paul Timm, STS Consultants