Loading...
HomeMy WebLinkAbout0114860-Plumbing CITY OF OSHKOSH 114860 No OSHKOSHPLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address2321 COMET STOwnerTIMOTHY R BEULENCreate Date06/24/2005 ContractorJOHN E MEYER COCategoryPlan 410 - Residential-Interior 0 Water Softner Bathtub1Shower10Wait. St.0Shamp Sink0Coffee Maker 10 WhirlpoolFloor DrainIce ChestFlr/Wst Sink 00Local Waste00Int Grease Trap Clothes Wshr Lavatory2Lndry Tray01Exam Sink0Catch Basin0Ext Grease Trap0 0 ToiletWash Ftn 2Disposal0BidetSculry Sink00RPZ Valve 0 Dishwasher Res. Sink1Beer Tap0Hand Sink0Urinal0Eye Wash Statn 0 0 Bar Sink 0Sump Pump0Lab Sink0Plaster Sink0Standp Rec1Wtr Sewer Mtrs0 Water Heater1Classrm SinkSterilizerSurgeons SinkIce MakerDeduct Meters 00000 Site Drain0Breakrm SinkDip WellF Prep SinkGar DrainWtr Usage Mtrs 0 0000 Drink FtnServ Sink Roof Drain0Ejector/GrindSoda Disp 0000 Misc. 0 Fixtures Use/Nature of Work Remodle of single family home. SizeMaterialType#Conn. Type Sanitary Sewer0 0 0 0 0 Storm Sewer0 0 0 0 0 Water Service0 0 0 0 Parcel Id # 0 1518080000 $0.00Permit Voided Valuation$5,000.00Plan ApprovalPermit Fees$77.00 Issued ByDate06/24/2005 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Date Signature Agent/Owner AddressPO BOX 2783OSHKOSHWI54903-2783Telephone Number235-2300 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.