HomeMy WebLinkAbout0114844-Building
No114844
CITY OF OSHKOSH
OSHKOSHBUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
ARLEN L NEUBAUER
Job Address1108 SCHOOL AVEOwnerCreate Date06/23/2005
DesignerContractorPORTSIDE PROPERTIES INC
Category140 - Interior RemodelingPlan
TypeBuildingSignCanopyFenceRaze
ZoningClass of Const:8Size
Sq. Ft.Projection
Unfinished/Basement0Rooms0Height0Ft.
Finished/Living
0Sq. Ft.Bedrooms0Stories2Canopies0
Garage0Sq. Ft.Baths0Signs0
Poured ConcreteFloating SlabPierOther
Foundation
Concrete BlockPostTreated Wood
Occupancy PermitNot RequiredFlood PlainHeight Permit
Park Dedication# Dwelling Units0# Structures0
SFR / Interior alterations to second floor: reframe stairs to second floor, Rearrange second floor to provide a 1/2 bath and altered front bedroom
Use/Nature
floor plan.
of Work
HVAC ContractorMCM AIR INCPlumbing ContractorPLUFF PLUMBING
Electric ContractorZIMMER ELECTRIC INC
Fees: Valuation$22,900.00Plan Approval$0.00Permit Fee Paid$133.00Park Dedication$0.00
06/23/200500/00/0000
Issued By:DateFinal/O.P.
Permit Voided
Parcel Id #0204370000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
SignatureDate
Agent/Owner
923 S MAIN STOSHKOSHWI549020000426-1544
Address-Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.