HomeMy WebLinkAbout0114801-Building (roof) � CITY OF OSHKOSH No 114801
�
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 629 OTTER AVE Owner ELAINE R SCHOENBORN Create Date 06/22/2005
Designer Contractor OWNER
Category 141 -Exterior Remodeling Plan
Type � Building 0 Sign 0 Canopy 0 Fence � Raze I
Zoning Class of Const: Size
Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. ❑ Projection ;
Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq.Ft. Baths 0 Signs 0
Foundation � Poured Concrete � Floating Slab � Pier � Other
� Concrete Block � Post � Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
— - - ----— _-- - __ —_
Use/Nature DUPLEX/Add 1 layer of roofing to existing layer on house. (2 layer Max.) *NO STRUCTURAL CHANGES.
of Work '
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $1,100.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00
Issued By: Date 06/22/2005 Final/O.P. 00/00/0000
� Permit Voided ' Parcel Id#0801770000
In the pertormance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure any necessary pprovals before starti such activity.
Signature ���y��� �;�;-�y.t,.��� Date �
�Z
AgenUOwner
Address 629 OTTER AVE OSHKOSH WI 54901 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection (i.e. Footing, Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.