Loading...
HomeMy WebLinkAbout0114801-Building (roof) � CITY OF OSHKOSH No 114801 � OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 629 OTTER AVE Owner ELAINE R SCHOENBORN Create Date 06/22/2005 Designer Contractor OWNER Category 141 -Exterior Remodeling Plan Type � Building 0 Sign 0 Canopy 0 Fence � Raze I Zoning Class of Const: Size Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. ❑ Projection ; Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq.Ft. Baths 0 Signs 0 Foundation � Poured Concrete � Floating Slab � Pier � Other � Concrete Block � Post � Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 — - - ----— _-- - __ —_ Use/Nature DUPLEX/Add 1 layer of roofing to existing layer on house. (2 layer Max.) *NO STRUCTURAL CHANGES. of Work ' HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,100.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Issued By: Date 06/22/2005 Final/O.P. 00/00/0000 � Permit Voided ' Parcel Id#0801770000 In the pertormance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary pprovals before starti such activity. Signature ���y��� �;�;-�y.t,.��� Date � �Z AgenUOwner Address 629 OTTER AVE OSHKOSH WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection (i.e. Footing, Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.