Loading...
HomeMy WebLinkAbout0114757-Building (remodel porch, siding & windows) � CITY OF OSHKOSH No 114757 , . ,ti OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD�. J� y'��� � ; ON THE WATER �- i Job Address 317 E NEW YORK AVE Owner RONALD UELLEN MARSHALL Create Date O6/21/2005 Designer Contractor A-Z HOME IMPROVEMENTS Category 141 -Exterior Remodeling Pian Type � Bui�ding 0 Sign 0 Canopy � Fence � Raze � Zoning Class of Const: Size Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. ❑ Projection � Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq.Ft. Baths 0 Signs 0 Foundation � Poured Concrete 0 Floating Slab � Pier � Other 0 Concrete Block � Post � Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature SFR/ Remodeling the porch to include new guardrails,landing and steps. Replacing 15 windows and residing the house. of Work I HVAC Contractor Piumbing Contractor Electric Contractor Fees: Valuation $14,000.00 Plan Approval $0.00 Permit Fee Paid $94.00 Park Dedication $0.00 Issued By: � Date 06/21/2005 Final/O.P. 00/00/0000 ❑ Permit Voided� Parcel Id# 1003270000 In the performance of this work I agree to perform atl work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any nec,�ssa rovals before starting such activity. �" � � � �������� Signature X �G„���- Z,L Date � � S AgenUOwner Address 1730 OREGON OSHKOSH WI 54902 - 0000 Telephone Number 233-5300 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address,Permit Number,Type of Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.