Loading...
HomeMy WebLinkAbout0000000 (2) August 10, 1981 E.C. '4errül Company 804 ;.i tzel Avenue Oshkosh, WI 54901 RE: Plumbing P1a'1 Approval for First Assembly of God Church,--3-5+-South \~ashburn Street, Plan ID 1fL5881 333 Gentlemen: Examination of the plumbing plans and specifications for the above-mentioned project nas been canple ted. In accord ,>¡ith Chapter 145, wisconsin Statutes, and Chapter H62, Wisconsin Administrative Code, the plumbing plans and specifications are approved con- tingent upoa compliaace with the sti1"11a tior\ noted below: 1. Dishwashers shall discharge to site drain. 2. Circuit vent to be between last two fL'ttures. 3. Provide vacuum breakérs on all wall hydrants. 4. Urinal tank is an lmapproved fixture. 5. See H62.15 for \;a ter conserving fixtures and supplies. 6. All pllliIlbing ?lans shall be stamped by designer. possible and stamp plans. Come in as soon as The architect, professional engineer, registered designer, owner or plumbing contractor shall keep, at the coastruction site, one set of plans bearing the sta'll? of approval. In the event installation of this plumbing systEm has not commenced within two years from this da t6, this approval shall becane void. A n8'.-1 application accanpanied by full examiaation fee shall be filed and an n¡>dated approval received before work may commence. In granting this approval, the City of Oshkosh or its representative does not hold itself liable for any defects in plans or specifications, plan omissions, examination oversight, coastruction or aoy damage th,'!t may reg~lt in or after installation and reserves the right to order changés or additions should con- ditions arise making this necéssary. E.G. ~ertill Go. ,*lI¡;US¡:' 10il19i!1 ~'Né Žerr I Co. AÜ~ust 10, 1931 Page 2 It shall be tlecessary for installing ¡>lumbér to obtain a phtmbing permit from the City of Oshkosh before proceeding with actual installation of this p1ulnbing systEm or any of its parts. Sincerely, :1A.RVIN HIGLEY Plumbing S'~ervisor ,mS] J/2338