HomeMy WebLinkAbout0000000 (2)
August 10, 1981
E.C. '4errül Company
804 ;.i tzel Avenue
Oshkosh, WI 54901
RE:
Plumbing P1a'1 Approval for First Assembly of
God Church,--3-5+-South \~ashburn Street, Plan
ID 1fL5881 333
Gentlemen:
Examination of the plumbing plans and specifications for the above-mentioned
project nas been canple ted.
In accord ,>¡ith Chapter 145, wisconsin Statutes, and Chapter H62, Wisconsin
Administrative Code, the plumbing plans and specifications are approved con-
tingent upoa compliaace with the sti1"11a tior\ noted below:
1.
Dishwashers shall discharge to site drain.
2.
Circuit vent to be between last two fL'ttures.
3.
Provide vacuum breakérs on all wall hydrants.
4.
Urinal tank is an lmapproved fixture.
5.
See H62.15 for \;a ter conserving fixtures and supplies.
6.
All pllliIlbing ?lans shall be stamped by designer.
possible and stamp plans.
Come in as soon as
The architect, professional engineer, registered designer, owner or plumbing
contractor shall keep, at the coastruction site, one set of plans bearing the
sta'll? of approval.
In the event installation of this plumbing systEm has not commenced within two
years from this da t6, this approval shall becane void. A n8'.-1 application
accanpanied by full examiaation fee shall be filed and an n¡>dated approval
received before work may commence.
In granting this approval, the City of Oshkosh or its representative does not
hold itself liable for any defects in plans or specifications, plan omissions,
examination oversight, coastruction or aoy damage th,'!t may reg~lt in or after
installation and reserves the right to order changés or additions should con-
ditions arise making this necéssary.
E.G. ~ertill Go.
,*lI¡;US¡:' 10il19i!1
~'Né Žerr I Co.
AÜ~ust 10, 1931
Page 2
It shall be tlecessary for installing ¡>lumbér to obtain a phtmbing permit from
the City of Oshkosh before proceeding with actual installation of this p1ulnbing
systEm or any of its parts.
Sincerely,
:1A.RVIN HIGLEY
Plumbing S'~ervisor
,mS] J/2338