Loading...
HomeMy WebLinkAbout0114689-Building (roof) ��� � CITY OF OSHKOSH No 114689 OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD F ,^ � ON THE WATER ' ' i � Job Address 45 CRIMSON LN Owner PHILIP R BARTELS Create Date 06/16/2005 Designer Contractor OWNER Category 141 -Exterior Remodeling Pian Type � Building � Sign 0 Canopy � Fence � Raze _� Zoning Class of Const: Size Unfinished/Basement _ _ 0 Sq.Ft. Rooms 0 Height ___0 Ft. ❑ Projection � Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq.Ft. Baths 0 Signs 0 Foundation � Poured Concrete � Floating Slab � Pier � Other � Concrete Block � Post � Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature �FR/ Reframing a roof over the existing flat roof. 2"x6"rafters 10'x 12'roof area. � of Work I , � i HVAC Contractor Piumbing Contractor Electric Contractor Fees: Valuation $2,500.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Issued By: Date 06/16/2005 Final/O.P. 00/00/0000 ❑ Permit Voided I Parcel Id# 1415880000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure�qy� ' pr bef arting such Gvity. ,�� ._ � / Signature � '� Date % C� 5 � f v AgenUOwner ` Address 1705 S WALDEN E APPLETON WI 54915 -4233 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address,Permit Number,Type of Inspection(i.e. Footing,Service,Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.