Loading...
HomeMy WebLinkAbout05-171.doc JUNE 14, 2005 05-171 RESOLUTION (CARRIED 6-0 LOST LAID OVER WITHDRAWN PURPOSE: CHANGE ORDER NO.1 I RIVERSIDE PARK RESTROOMS INITIATED BY: DEPARTMENT OF COMMUNITY DEVELOPMENT BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, copy of which is attached, is hereby approved: C.R. MEYER & SONS COMPANY 895 W. 20th Avenue Oshkosh, WI 54902 Net Decrease: ($87,446.00) PURPOSE: See attached CHANGE ORDER NO.1 TO: CR Meyer & Sons Co. 895 W. 20th Avenue Oshkosh, WI 54902 Date: June 7, 2005 Your present contract with the City of Oshkosh for construction of the restroom at Riverside Park is hereby amended and changed as follows: DEDUCT: Per the attached letter dated February 14, 2005 $ 87,446.00 Original Contract Amount Net Change by Change Orders Contract Sum to Date $661,806.00 ( 87.446.00) $574,360.00 RECOMMENDED: CITY OF OSHKOSH BY: City Manager Director of Community Development City Clerk I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. ~OV ~~ns Co. Finance Director Approved as to form: Lynn Lorenson, Assistant City Attorney 895 W. 20th Avenue, P.O. Box 2157 Oshkosh, WI 54903-2157 (920) 235-3350 Fax (920) 235-3419 February 14, 2005 ~ IVEYE f Building Solutions Since 1888 Mr. Jackson Kinney City of Oshkosh 215 E. Church Avenue Oshkosh, WI 54902 Reference: Riverside Park Restrooms Dear Mr. Kinney: We have advertised for, and received numerous quotes for subcontracted items of work as well as all materials. As a breakdown of the costs for this project, we hereby submit the following: . Division 1: Design & Drawings, Management & Supervision, Temporary Facilities and Services, Equipment, Freight, Bond and State Submittal Fees. $38,855.00 . Division 2: Earthwork, Erosion Control, Piling (Includes Winter Conditions ). $50,521.00 . Division 3: Concrete Foundations and Flatwork (Includes Winter' Conditions). $60,500.00 . Division 4: Colored, Split-face Concrete Masonry to match Leach Pavilion (Includes Winter Conditions). $143,640.00 . Divisiòn 5: Miscellaneous Metals. $1,082.00 . Division 6: Wood Trusses, Plywood Roof Sheathing, Plywood Ceiling Sheathing, Plywood Soffits, Wood Sub-fascia, Pine Trim. $55,906.00 . Division 7: Fiberglas Batt Ceiling Insulation, Colored, Standing Seam Metal Roof, Metal Soffits, Metal Fascia, Downspouts and Gutters, Attic Access Hatch, Caulking and Sealants. $53,424.00 shareUeblletterslriverside park restrooms-1.doc City of Oshkosh February 14,2005 Page - 2 . Division 8: Hollow Metal Door Frames, Hollow Metal Doors, Door Hardware. $11,430.00 . Division 9: Gypsum Ceiling, Taping & Finishing Gypsum, Epoxy Paint on Interior Walls and Ceilings, Masonry Sealer on Exterior. $27,686.00 . Division 10: Metal Toilet Partitions, Toilet Room Accessories. $26,682.00 . Division 15: Design, Submittal, and Installation of Ventilation Systems, Ti"e-in to Sanitary Sewer and Water Service, 10 Wall-hung Urinals, 42 Floor-mounted Water Closets, 32 Wall-hung Lavatories, 2 Floor- mounted Janitor's Sinks, Floor Drains & Clean-outs, Plumbing Design and Submittal. $77,822.00 . Division 16: 2 - 100 amp Three Phase Panels, 24 Interior Light Fixtures, 12 Power Receptacles, 2 Water Heater Hook-ups, 8 Occupancy Sensors, 10 Exterior Soffit Lights with Dusk to Dawn Control, 2 Exhaust Fans, Design and Submittal. TOTAL COST: $26,812.00 $574,360.00 If we can be of further assistance, please feel free to contact us. Sincerely, C. R. MEYER AND SONS COMPANY ~~-- Y ¥rown Project Manager cc: Paul Timm, STS Consultants