Loading...
HomeMy WebLinkAbout0114657-Building (patio) e OSHKOSH ON THE WATER Job Address 2530 KAITL YNN DR CITY OF OSHKOSH No 114657 BUILDING PERMIT - APPLICATION AND RECORD Owner MICHAEL J/ROBIN FLANIGAN Create Date 06/14/2005 Designer Contractor KOLLING CONSTRUCTION LLC Category 142 - Decks, Patios, Ramps Plan Type 18 Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 Size Zoning Unfinished/Basement 0 Sq.Ft. ~ Sq. Ft. U Projection 1 Finished/Living Canopies 0 Garage ~ Sq. Ft. Signs 0 Foundation 8 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 SFR/ LATE PERMIT/ Installing a 18'x14' concrete patio off the addition. Use/Nature of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $600.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Issued By: Date 06/14/2005 Final/O.P. 00/00/0000 U Permit Voided 1 Parcelld # 1227160000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address E9381 FOREST PINE DR Agent/Owner NEW LONDON WI 54961 - 0000 Telephone Number 920-982-9928 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. r,J § ~ 0:: 0 z ~ ¡- ~ Ò M cc ~I .~ ~ ~ Z d .. '" J!2 15 ro u (/) '" 11") (ij 8 ~ N :2 - w '<t 0 N 'õ CC ð <t: iJ ~ i'j ~ r55 .9Z'SS .0'06 .0'06 b Iti . "'It ~ I Ol9Z O£9Z 06vZ