HomeMy WebLinkAbout0113850-Plumbing (pumps)
CITY OF OSHKOSH
No
113850
OSHKOSH
ON THE WATER
Job Address 2737 HARRISON ST
PLUMBING PERMIT - APPLICATION AND RECORD
Bathtub 0
Whirlpool ~
Lavatory ~
Toilet 0
Res. Sink 0
Bar Sink 0
Water Heater 0
Site Drain 0
Roof Drain ~
Misc. 0
Fixtures
Use/Nature
of Work
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Owner LEACH CO Create Date 05/03/2005
Category 440 - Industrial-Interior Plan
0 Water Softner 0 Wait St. 0 Shamp Sink 0 Coffee Maker 0
0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Int Grease Trap 0
0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0
0 BeerTap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
2 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0
0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0
0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0
1 Drink Ftn 0 Serv Sink 0 Soda Disp 0
Contractor M P KELLY
Sump Pump
Class,m Sink
Breakrm Sink
Ejectc,,/Grind
Repiace pumps
Size
Material
Type
#
Conn. Type
Sanitary Sewer
0
0
0
0
0
Storm Sewer
Water Service
Parcelld #
1519600000
Valuation
$3,329.00
Plan Approval
$0.00
Permit Fees
$21.00 0 Permit Voided I
Issued By
Date 05/04/2005
In the performance of this work, i agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement hoider(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 665 N MAIN ST
AgenUOwner
OSHKOSH
WI 54901 - 4431
Telephone Number 231-1750
To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.