Loading...
HomeMy WebLinkAbout0113850-Plumbing (pumps) CITY OF OSHKOSH No 113850 OSHKOSH ON THE WATER Job Address 2737 HARRISON ST PLUMBING PERMIT - APPLICATION AND RECORD Bathtub 0 Whirlpool ~ Lavatory ~ Toilet 0 Res. Sink 0 Bar Sink 0 Water Heater 0 Site Drain 0 Roof Drain ~ Misc. 0 Fixtures Use/Nature of Work Shower Floor Drain Lndry Tray Disposal Dishwasher Owner LEACH CO Create Date 05/03/2005 Category 440 - Industrial-Interior Plan 0 Water Softner 0 Wait St. 0 Shamp Sink 0 Coffee Maker 0 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Int Grease Trap 0 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0 0 BeerTap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 2 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0 1 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Contractor M P KELLY Sump Pump Class,m Sink Breakrm Sink Ejectc,,/Grind Repiace pumps Size Material Type # Conn. Type Sanitary Sewer 0 0 0 0 0 Storm Sewer Water Service Parcelld # 1519600000 Valuation $3,329.00 Plan Approval $0.00 Permit Fees $21.00 0 Permit Voided I Issued By Date 05/04/2005 In the performance of this work, i agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement hoider(s) and to secure any necessary approvals before starting such activity. Signature Date Address 665 N MAIN ST AgenUOwner OSHKOSH WI 54901 - 4431 Telephone Number 231-1750 To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.