Loading...
HomeMy WebLinkAbout0113849 P CITY OF OSHKOSH No 113849 OSHKOSH ON THE WATER Job Address 824 E MURDOCK AVE PLUMBING PERMIT. APPLICATION AND RECORD Owner WilLIAM A HAMMOND Create Date 05/03/2005 Contractor M P KEllY Category 440 - Industrial-Interior Plan Bathtub 0 Shower 0 Water Softner 0 Wait.St. 0 Shamp Sink 0 Coffee Maker 0 Whirlpool 0 Floor 10rain 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Int Grease Trap 0 Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin ~ Ext Grease Trap ~ Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0 Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0 Water Heater 1 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0 Site Drain 0 Breakrm Sink 0 DipWell 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0 Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Misc. 0 Fixtures Use/Nature of Work Replace water heater Size Material Type # 0 0 0 0 0 0 0 0 0 0 Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1519410100 Valuation $669.00 Plan Approval $0.00 Permit Fees $20.00 D Permit Voided I Issued By Date 05/04/2005 In the performance of this work. I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 665 N MAIN ST AgenUOwner OSHKOSH WI 54901 - 4431 Telephone Number 231-1750 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ""