CHANGE ORDER # 1
Dated: November 10,2004
TO: Fischer-Ulman Construction, Inc.
1115 S. Theodore Street
Appleton, WI 54915
Your present contract with the City of Oshkosh, Contract No. 04-06, is hereby amended
and changed as follows:
NET INCREASE TO SECTION 1- SIDEWALK REHAB
$22,923.42
NET INCREASE TO CONTRACT:
$22,923.42
CITY OF OSHKOSH
u ~k-
l'
Recommended:
llv:cl (,. ~
Director of Publi Works
Approved and accepted:
-~~þu~
Contractor
I certify that provision has been made to pay the liability that will accrue to the City of
Oshkosh, Wisconsin, under the within Change Order.
~av~
Comptroller
A~proveä;t~l:
~" .~
- City Attorney
}'
, .f
CONTRACT: 04-06 CHANGE ORDER #1
SECTION I - SIDEWALK REHAB
DESCRIPTION
INCREASE IN
COST PER UNIT CONTRACT
PRICE
DECREASE IN
CONTRACT PRICE
1 Approx. 74,000
square feet of
sidewalk removal &
driveway removal,
complete as
specified, per square
foot 74,000.00 85,515.14 11,515.14 $0.30 $3,454.54
2 Approx. 3,000 linear
feet of
concrete/asphalt
sawing, complete as
specified, per linear
foot 3,000.00 4,347.40 1,347.40 $2.00 $2,694.80
3 Construct approx.
86,000 square feet of
4" thick concrete
sidewalk in various
locations in the City
of Oshkosh,
complete as
specified, per square
foot 86,000.00 83,518.91 -2,481.09 $2.25 ($5,582.45)
4 Approx. 18,000
square feet of 4"
thick concrete
sidewalk 7' wide
(Jackson
Street/Pearl
Avenue), per square
foot 18,000.00 4,067.00 -13,933.00 $1.95 ($27,169.35)
5 Construct approx.
11,000 square feet of
6" thick concrete
sidewalk in various
locations in the City
of Oshkosh,
complete as
specified, per square
foot 11,000.00 15,649.15 4,649.15 $2.86 $13,296.57
6 Construct approx.
2,500 square feet of
6" thick textured
concrete wheel chair
ramps, complete as
specified, per square
foot
2,500.00 2,282.71 -217.29 $3.20 ($695.33)
Page 1
, r
,
CONTRACT: 04-06 CHANGE ORDER #1
ITEM CONTRACT INSTALLED NET NET INCREASE IN DECREASE IN
DESCRIPTION COST PER UNIT CONTRACT
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE
7 Approx. 1 ,500
square feet of three
(3") inch asphalt
replacement,
complete as
specified, per square
foot 1,500.00 3,262.45 1,762.45 $2.60 $4,582.37
8 Approx. 250 linear
feet of curb and
gutter removal,
complete as
specified, per linear
foot 250.00 316.50 66.50 $3.00 $199.50
9 Approx. 300 linear
feet of 30" curb and
gutter, complete as
specified, per linear
foot 300.00 474.40 174.40 $14.20 $2,476.48
10 Approx. 300 square
yards of terrace
restoration, including
seed, fertilize, and
mulch, complete as
specified, per square
yard
300.00 603.40 303.40 $3.10 $940.54
11 Furnish and install
approx. 50 pavement
ties, complete as
specified, each
50.00 78.00 28.00 $7.00 $196.00
12 Construct approx.
3,000 square feet of
4" thick concrete
sidewalk in Water
Dept. repair locations
at approx. 40 sites,
complete as
specified, per square
foot 3,000.00 3,891.29 891.29 $3.30 $2,941.26
13 Construct approx.
1,000 square feet of
6" thick concrete
sidewalk in Water
Dept. repair locations
at approx. 20 sites,
complete as
specified, per square
foot 1,000.00 1,188.00 188.00 $3.70 $695.60
Page 2
"
CONTRACT: 04-06 CHANGE ORDER #1
ITEM CONTRACT INSTALLED NET NET INCREASE IN DECREASE IN
NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE COST PER UNIT CONTRACT CONTRACT PRICE
PRICE
14 Approx. 100 square
yards of 7"
non-reinforced
concrete pavement
removal and
replacement,
including sawing,
pavement ties,
integral curb &
grading, terracing &
traffic control,
complete as
specified, per square
yard 100.00 -100.00 $34.55 ($3,455.00)
15 Approx. 1,200
square yards of 8"
non-reinforced
concrete pavement
removal and
replacement,
including sawing,
pavement ties,
integral curb &
grading, terracing &
traffic control,
complete as
specified, per square
yard 1,200.00 1,084.58 -115.42 $34.00 ($3,924.28)
16 Approx. 500 square
yards of 8" special
High Early Strength,
non-reinforced
concrete pavement
removal and
replacement,
including sawing,
pavement ties,
integral curb and
grading, terracing
and traffic control,
complete as
specified, per square
yard 500.00 284.49 -215.51 $37.00 ($7,973.87)
'/A 17 Approx. 250 tons
extra crushed stone
base, complete as
specified, per ton 250.00 225.47 -24.53 $10.00 ($245.30)
Page 3
"..
CONTRACT: 04-06 CHANGE ORDER #1
ITEM CONTRACT INSTALLED NET NET INCREASE IN DECREASE IN
NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE COST PER UNIT CONTRACT CONTRACT PRICE
PRICE
18 Approx. 1,200 linear
feet of No.4 epoxy-
coated reinforcement
rods, installed as
specified, per lin. ft.
1,200.00 961.00 -239.00 $1.50 ($358.50)
19 Provide $1,500 to
the City of Oshkosh
for project
management
communications,
complete as
specified, lump sum
1.00 1.00 $1,500.00
SECTION 1- (BID ITEMS 1 -19) - SUB-TOTALS
$31,477.66
($49,404.08)
ADDITONAL WORK REQUIRED: C.O. # 1 - SECTION I - CONCRETE PAVING
ITEM CONTRACT INSTALLED NET NET INCREASE IN DECREASE IN
NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE COST PER UNIT CONTRACT CONTRACT PRICE
PRICE
1 9" non-reinforced
concrete pavement
removal and
replacement,
including sawing,
pavement ties,
;:; integral curb &
grading, terracing &
traffic control,
complete as
specified, per square
yard 232.59 232.59 $37.50 $8,722.13
2 9" 7-bag non-
reinforced concrete
pavement removal
and replacement,
including sawing,
pavement ties,
integral curb &
grading, terracing &
traffic control,
complete as
specified, per square
yard 78.32 78.32 $39.00 $3,054.48
Page 4
.~ . ",
CONTRACT: 04-06 CHANGE ORDER #1
ITEM CONTRACT INSTALLED NET NET INCREASE IN DECREASE IN
NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE COST PER UNIT CONTRACT CONTRACT PRICE
PRICE
3 9" 9-bag non-
reinforced concrete
pavement removal
and replacement,
including sawing,
pavement ties,
integral curb &
grading, terracing &
traffic control,
complete as
specified, per square
yard 112.89 112.89 $40.50 $4,572.05
4 8" 7-bag non-
reinforced concrete
pavement removal
and replacement,
including sawing,
pavement ties,
integral curb &
grading, terracing &
traffic control,
complete as
specified, per square
yard 445.88 445.88 $36.00 $16,051.68
5 9" thick concrete
sidewalk in Water
Dept. repair location,
complete as
specified, per square
foot 443.75 443.75 $4.40 $1,952.50
6 Miscellaneous extras
(Le. brick, mortar,
clean out inlet), lump
sum $350.00 $350.00
7 Installation of
modular block walls
on Sawyer Street
(includes block w/top
cap, backfill, topsoil,
seed, fertilizer, mulch
<; and traffic control),
lump sum
$6,147.00 $6,147.00
ADDITIONAL WORK: C.O. # 1 - (ITEMS 1 - 6) - SUB-TOTAL
$40,849.84
$0.00
$22,923.42
NET INCREASE TO SECTION I -
Page 5
. ,.'. !>.
,
ITEM
NUMBER
DESCRIPTION
CONTRACT: 04-06 CHANGE ORDER #1
INSTALLED
QUANTITIES
NET INCREASE IN
DECREASE COST PER UNIT CONTRACT
PRICE
NET
INCREASE
NET INCREASE TO SECTIONS I, II, III, IV
NET DECREASE TO SECTIONS I, II, III, IV
$72,327.50
($49,404.08)
NET INCREASE TO CONTRACT:
$22,923.42
Page 6