Loading...
HomeMy WebLinkAboutPW CNT 03-21/Cng Ord #1 '" t -t-- ..10:.' 7~ CHANGE ORDER # 1 DATED: October 7,2004 TO: Ronet Construction Corp. 1335 Cornell Road Green Bay, WI 54313 Your present contract with the City of Oshkosh, Contract No. and changed as follows: 03-21 , is hereby amended NET DECREASE TO SECTION I - STORM SEWER: ($11,617.89) ($11 ,617.89) NET DECREASE TO CONTRACT: Recommended: ))lk-J C-_~ Director of Publi Works Approved and accepted: ~~~. U Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. ~Q\'~ Comptroller ~-" 'r¡ CONTRACT: 03-21 CHANGE ORDER # 1 SECTION I - STORM SEWER ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 1. Furnish and install approx. 15 linear feet of 12" Storm Sewer, complete as specified, per linear foot 15.00 12.00 -3.00 $25.00 ($75.00) 2. Furnish and install approx. 20 linear feet of 22" x 26" RCP Storm Sewer, complete as specified, per linear foot 20.00 20.00 $86.00 3. Furnish and install approx. 3,564 linear feet of 30" HOPE Storm Sewer, complete as specified, per linear foot 3,564.00 0.00 -3,564.00 $32.25 ($114,939.00\ 4. Furnish and install approx. one (1) 30" Galvanized Endwall, complete with riorao, each 1.00 1.00 $290.00 5. Furnish and install approx. four (4), 6' x 10' Box Storm Manholes, complete as specified with castings, each 4.00 0.00 -4.00 $4,400.00 ($17,600.00) 6. Furnish and install approx. one (1) 6' x 15' Box Storm Manhole, complete as specified with castings, each 1.00 0.00 -1.00 $5,200.00 ($5,200.00) 7. Furnish and install approx. two (2), 10' x 10' Storm Box Manholes, complete as specified with castings, each 2.00 0.00 -2.00 $5,750.00 ($11,500.00) 8. Furnish and install approx. one (1),12" Drain Basin, complete as specified with casting, each 1.00 1.00 $819.00 9. Furnish and install approx. two (2), 24" Drain Basin, complete as specified with castings, each 2.00 0.00 -2.00 $700.00 ($1,400.00) 10. Remove approx. 250 1.0. of trees and stumps, complete as specified, per inch diameter 250.00 352.00 102.00 $24.00 $2,448.00 Page 1 ~ {, CONTRACT: 03-21 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 11. Construct approx. 1,165 linear feet of Open Ditching, complete as specified, per lin. ft. 1,165.00 1,272.00 107.00 $12.0172 $1,285.84 12. Grade, Seed and Mulch approx. 4,400 square yards, complete as specified, per sa. yd. 4,400.00 4,970.00 570.00 $0.75 $427.50 13. Furnish and install approx. 390 square yards of Erosion Mat, complete as specified, per sa. vd. 390.00 285.00 -105.00 $3.00 ($315.00) 14. Furnish and install approx. 100 linear feet of Silt Fence, complete as specified, per lin. ft. 100.00 30.00 -70.00 $2.00 ($140.00) 15. Provide $375.00 to the City of Oshkosh for project management communications, complete as specified, lump sum 1.00 1.00 $375.00 SECTION 1- (BID ITEMS 1 -15) - SUB-TOTALS $4,161.34 ($151,169.00) ADDITONAL WORK REQUIRED: C.O. # 1 - SECTION 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE Storm Sewer design modified to install 34" x 53" RCP Storm Sewer Pipe instead of double 30" HOPE to simplify system and save cost. Structures also modifed to reflect new design. 1 Furnished and installed 1,772.55 linear feet of 34" x 53" RCP Storm Sewer 1,772.55 1 ,772.55 $62.85 $111,404.77 2 Furnished and installed 40 linear feet of 30" RCP Storm Sewer 40.00 40.00 $32.25 $1,290.00 3 Furnished and installed four (4) inline tee manholes over 34" x 53" RCP Storm Sewer 4.00 4.00 $1,900.00 $7,600.00 4 Furnished and installed one (1) 6.1' x 12' special manhole (MH #12), each 1.00 1.00 $4,825.00 $4,825.00 5 Furnished and installed two (2) approximately 7' x 8' manholes (MH # 6, 7), each 2.00 2.00 $4,460.00 $8,920.00 Page 2 ,~ Þ;!, CONTRACT: 03-21 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 6 Furnished and installed two (2) inlet structures over 34" x 53" Storm Sewer, each 2.00 2.00 $675.00 $1,350.00 ADDITIONAL WORK: C.O. # 1 . (ITEMS 1 .6) - SUB-TOTAL $135,389.77 $0.00 NET DECREASE TO SECTION I - ($11,617.89) NET DECREASE TO CONTRACT: ($11,617.89) Page 3