Loading...
HomeMy WebLinkAboutRaw Water Intake-Cng Ord 8 , ç , of. II P ~ IE lìfü1ifT¡fi1 UlJ II II NOV 4 2004 ~ CHANGE ORDER CITY OF OSHKOSH, WI CITY CONTRACT 02-01, RAW WATER INTAKE AND TRANSMISSION MAIN Order No. 8 Date: September 27,2004 Agreement Date: May 28, 2002 NAME OF PROJECT: City Contract 02-01, Raw Water Intake and Transmission Main OWNER: City of Oshkosh CONTRACTOR: Lunda Construction Company The following changes are hereby made to the CONTRACT DOCUMENTS: . The Contract Price is increased by$1O3,057.31 and the Contract Time for Substantial Completion and Final Completion have each been extended by 30 calendar days. , . This change order serves as full and final resolution regarding the claims and credits described. herein. All other conditions and requirements ofthe Contract Documents shall remain unchanged. Reason for changes: The Contractor submitted a request for time extensions and additional compensation for claimed out-of-scope work in its November 18, 2003 and January 20, 2004 letters, respectively, from Mr. Paul Gevers of Lunda to Mr. Jim Zdeb ofMWH. A copy of these letters is attached hereto. Extensive discussions took place between the Owner, the Contractor and the Engineer regarding the four items in these letters together with the Owner's request for credits due to grading changes at the Diversion Vault and its acceptance of lesser testing requirements for the transmission main piping between the Diversion Vault and the Pretreatment Basin. The negotiated net increase in Contract Price and Contract Time was agreed upon as final settlement for these issues. 10/6/2004 CO8 - I , t Change to CONTRACT PRICE: Original CONTRACT PRICE: Current CONTRACT PRICE adjusted by previous CHANGE ORDER $ 7,304,067.00 $ 7,580,619.89 Total Change in CONTRACT PRICE for this CHANGE ORDER No.8 $ 103,057.31 The CONTRACT PRICE including this CHANGE ORDER will be $ 7,683,677.20 Chan2e to CONTRACT TIME: The CONTRACT TIME will be changed as follows: The time for Substantial Completion shall be changed from 660 calendar days to 690 calendar days, and the time for Final Completion shall be changed from 780 calendar days to 810 calendar days. 10/6/2004 CO8-2 APPROV ALS Accepted by (Contractor): Jaw?À~ ~ y~£~ (0/& kl'04- , Date Recommended by (Engineer): IDldJlzCYJý , . Date Recommended: < ~J G.~ Director of Public W rks CITY OF OSHKOSH By: '7/4 ~ City Manager .~~ ~.,-y-,. I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. . --D~ ú ~ Comptroller APPROVED 10/6/2004 CO8-3 ...' . """. . LUNDA CONSTRUCTION COMPANY 2000 TAYLOR STREET. P.O. BOX 228 LImE CHUTE, WI 54140 PH: (920) 788-5238 FAX: (920) 788-0229 An Equal Employment Opportunity Employer. Constructing Safely November 18,2003 Document No. 1900-348 Montgomery Watson Harza 115 South 84th Street Suite 200 Milwaukee WI 53214-1473 Attn: Jim Zdeb Re: City of Oshkosh - Contract 02-01 Raw Water Intake & Transmission Main MWH Project 4030034 Time Extension Jim: Lunda Construction Company is writing this letter to request a time extension due to delays encountered through the project. 1. Rock excavation Rock excavation from station point 20-00 to 31-50. The soil borings BL 3 @ station point 15-00 and BL 5 @ station point 24-00 do not show any bed rock. The areas that we encountered the bed rock there were no specific borings for these areas. We had to rely on the borings in the bid documents as reference above to show the soil conditions. The borings did not represent there areas excavated. The time delays were approximately 14 workingQ~y~. During this time that we encountered rock we were working 24 hours per day 6 days per week to try and maintain the schedule. 2. Turbidity barrier Lunda Construction Company started the 2003 season with an approved ECIP. After the original approved turbidity barrier was installed it was mandated that we install a deeper turbidity barrier. There was a 30 day delay due to the availability of this turbidity barrier. The delivery of this barrier prevented Lunda Construction Company from working on the controlling item of work. The controlling item of work being the intake line. 2000 Taylor St. . P.O. Box 228 . Little Chute, WI 54140-0228 . Phone 920-788-5238 . FAX 920-788-0229 .dO1 AlrlF>r~nn ~t .' P n Rnv ?S!S! . ~r.hnfiF>lrl WI fi.d47f\-n?RR . Phnnp. 71 fi-::Ififi-4R4R . I=A)( 71 fi-~fifi- 7710 " 'f .. . .~t . . ,I' ,O, " 3. Breaching of pretreatment basin At the time of breaching the pretreatment basin we were notified that we could not excavate due to the make up of the chemicals found in the soils contaminated in the pretreatment basin. The project specifications did not show any special means and methods of handling contaminated soils. Therefore it was necessary to construction a soil retention wall to isolate the contaminated soils from the work area. This required an additional 1 0 working days to perform this work. 4. Additional stone required at intake crib The bid documents required a minimum of 12" of stone under the intake crib and armour stone. Due to the stability of the soil on the lake bottom it was necessary to remove approximately 4' of organic material and replace it with %" clear stone. This work required an additional 3 days of work. If you have any questions please give me a call. Sincerely, LUNDA CONSTRUCTION COMPANY Industrial Division --/~ ~~ç Paul J. Gevers Project Manager PJG/jlp 2 - .- . . LUNDA CONSTRUCTION COMPANY 2000 TAYLOR STREET. P.O. BOX 228 LITTLE CHUTE, WI 54140 PH: (920) 788-5238 FAX: (920) 788-0229 An Equal Employment Opportunity Employer. Constructing Safely January 20, 2004 Document No. 1900-354 Montgomery Watson Harza 115 South 84th Street Suite 200 Milwaukee WI 53214-1473 Attn: Jim Zdeb Re: City of Oshkosh - Contract 02-01 Mr. Zdeb: Per Lunda Construction Company letter written on 11-18-03. Document No. 1900-348. We consider these items not in our scope of work. Following is a summary of work and cost associated. 1. Rock Excavation - See the attached Time and Material sheets for cost references. Total Cost - - - - - - - - - - - - - - - $114,031.15 2. Turbidity Barrier 1700 LF x $72.00 LF - - - - - - - - - - - - - - - - $122,400.00 The above pricing is per contract pricing for added turbidity barrier. 3. Pretreatment Basin - See the attached Time and Material sheets for cost references. Total Cost - - - - - - - - - - - - - - - - $ 52,782.87 4. Additional stone at intake crib - see the attached Time and Material sheets for cost references. Total Cost - - - - - - - - - - U 5.132.35 Total Cost for all items If you have any questions please let me know. $304,346.37 Sincerely, LUNDA CONSTRUCTION COMPANY Industrial Division c-- ~ ~ c::5~ Paul J. Gevers Project Manager PJG/jlp 2000 Taylor S1. . P.O. Box 228 . Little Chute, WI 54140-0228 . Phone 920-788-5238 . FAX 920-788-0229 401 Alderson S1. . P.O. Box 288 . Schofield, WI 54476-0288 . Phone 715-355-4848 . FAX 715-355-7710