Loading...
HomeMy WebLinkAboutPW CNT 03-04/Cng Ord #3 -. sa STRAND ASSOCIATES. INc.. ~~ ENGINEERS 910 West Wingra Drive Madison, WI 53715 Phone: 608-251-4843 Fax: 608-251-8655 Office Locations Madison. WI Joliet, IL Louisville. KY Lexington, KY Mobile. AL Columbus, IN Lancaster, OH Indianapolis, IN Milwaukee, WI www.strand.com March 21,2005 CHANGE ORDER NO.3 PROJECT: OWNER: CONTRACT: CONTRACTOR: Standby Power System and SCADA Upgrade City of Oshkosh, Wisconsin 03-04 The Selmer Company Description of Change 3a Delete paving of Dempsey Drive 3b Provide treated wood blocking at the top of the new generator building block wall for roof termination. Provide concrete base for future third generator radiator and concrete stoop for roof access ladder. Provide three surge arrestors in the service entrance switchgear on the incoming utility service. Provide conduit and wire from each generator control panel to level switches (2) on associated radiator. Install intrinsically safe controller and provide 120 volt power to controller for each overhead door (two total). Provide neutral CT for existing 400 amp circuit breaker used to feed the new MCC-13. Provide a fused disconnect for the service entrance switchgear batteries and for the paralleling switchgear batteries. Utility Company charges over specified allowance. Provide conduit and wiring to generator winding heater (two units total). Provide neutral conductors to service entrance switchgear. Relocate thermostat in the lab office to the lab. 3c 3d 3e 3f 3g 3h 3i 3j 3k 31 3m Delete remaining computer allowance. Delete telemetry system allowance. 3n 30 Delete remaining contingency allowance. Delete allowance for unsuitable foundation material for structures and roads. Delete allowance for unsuitable foundation material for utility trenches. 3p 3q TOTAL V ALUE OF THIS CHANGE ORDER: Contract Price Adjustment Original Contract Price Previous Change Order Adjustments DEDUCT ($6620.00) ADD $5,364.00 ADD $1,579.00 ADD $525.26 ADD $2,130.99 ADD $746.22 ADD $1,440.23 ADD $1,343.10 ADD $2,320.26 ADD $320.00 ADD $2691.00 ADD $272.00 DEDUCT ($4,122.80) DEDUCT ($3,600.00) DEDUCT ($252.29) DEDUCT ($550.00) DEDUCT ($850.00) ADD $2,736.97 $2,837,000.00 $0 ,#'- 5a STRAND ASSOCIATES, INc." ENGINEERS . ~ City of Oshkosh - The Selmer Company Contract 03-04, Change Order No.3 Page 2 March 21, 2005 Adjustment in Contract Price this Change Order Current Contract Price including this Change Order Contract Completion Date Adjustment Original Contract Completion Date Substantial Completion Final Completion Substantial Completion Final Completion Substantial Completion Final Completion Substantial Completion Final Completion Contract Completion Date Adjustments due to previous Change Orders Contract Completion Date Adjustments due to this Change Order Current Contract Completion Dates including all Change Orders $2,736.97 $2,839,736.97 November 30, 2004 December 31, 2004 None None April 1, 2005 May 20, 2005 April l, 2005 May 20, 2005 This document shall become a supplement to the Contract and all provisions will apply hereto. RECOMMENDED ~~ ENGINEER - ~ociates, Inc. APPROVED ~ ~ CONTRACTOR - The Selmer Company RECOMMENDE ~Jc.. I certify that provision has been made to pa the liability that will accrue to the City of Oshkosh, Wisconsin under this Change Order. <¿Qu ~ ~ (') í, ~u-e,J City Comptroller ~.E~ ~ t t ey TLF:jlg\\S:\@SAI\351--400\382\638\Wrd\Change Orders\Change Order No 3,doc "3 / ;) / J ;4;05 Date ~liz/o5 Date 'I - '-;løø ~ Date ?I- /.if -7'.fptfP :r- Date ~(~~dOOS Date I / ". 4 ¡ I -3 () )< Date ¡ , if 9/-6]' Dat