March 21,2005
CHANGE ORDER NO.3
PROJECT:
OWNER:
CONTRACT:
CONTRACTOR:
Standby Power System and SCADA Upgrade
City of Oshkosh, Wisconsin
03-04
The Selmer Company
Description of Change
3a
Delete paving of Dempsey Drive
3b
Provide treated wood blocking at the top of the new
generator building block wall for roof termination.
Provide concrete base for future third generator radiator
and concrete stoop for roof access ladder.
Provide three surge arrestors in the service entrance
switchgear on the incoming utility service.
Provide conduit and wire from each generator control
panel to level switches (2) on associated radiator.
Install intrinsically safe controller and provide 120 volt
power to controller for each overhead door (two total).
Provide neutral CT for existing 400 amp circuit breaker
used to feed the new MCC-13.
Provide a fused disconnect for the service entrance
switchgear batteries and for the paralleling switchgear
batteries.
Utility Company charges over specified allowance.
Provide conduit and wiring to generator winding heater
(two units total).
Provide neutral conductors to service entrance
switchgear.
Relocate thermostat in the lab office to the lab.
3c
3d
3e
3f
3g
3h
3i
3j
3k
31
3m
Delete remaining computer allowance.
Delete telemetry system allowance.
3n
30
Delete remaining contingency allowance.
Delete allowance for unsuitable foundation material for
structures and roads.
Delete allowance for unsuitable foundation material for
utility trenches.
3p
3q
TOTAL V ALUE OF THIS CHANGE ORDER:
Contract Price Adjustment
Original Contract Price
Previous Change Order Adjustments
DEDUCT ($6620.00)
ADD $5,364.00
ADD $1,579.00
ADD $525.26
ADD $2,130.99
ADD $746.22
ADD $1,440.23
ADD $1,343.10
ADD $2,320.26
ADD $320.00
ADD $2691.00
ADD $272.00
DEDUCT ($4,122.80)
DEDUCT ($3,600.00)
DEDUCT ($252.29)
DEDUCT ($550.00)
DEDUCT ($850.00)
ADD $2,736.97
$2,837,000.00
$0
,#'-
5a
STRAND
ASSOCIATES, INc."
ENGINEERS
.
~
City of Oshkosh - The Selmer Company
Contract 03-04, Change Order No.3
Page 2
March 21, 2005
Adjustment in Contract Price this Change Order
Current Contract Price including this Change Order
Contract Completion Date Adjustment
Original Contract Completion Date
Substantial Completion
Final Completion
Substantial Completion
Final Completion
Substantial Completion
Final Completion
Substantial Completion
Final Completion
Contract Completion Date Adjustments
due to previous Change Orders
Contract Completion Date Adjustments
due to this Change Order
Current Contract Completion Dates
including all Change Orders
$2,736.97
$2,839,736.97
November 30, 2004
December 31, 2004
None
None
April 1, 2005
May 20, 2005
April l, 2005
May 20, 2005
This document shall become a supplement to the Contract and all provisions will apply hereto.
RECOMMENDED
~~
ENGINEER - ~ociates, Inc.
APPROVED
~ ~
CONTRACTOR - The Selmer Company
RECOMMENDE
~Jc..
I certify that provision has been made to pa the liability that
will accrue to the City of Oshkosh, Wisconsin under this Change
Order.
<¿Qu ~ ~ (') í, ~u-e,J
City Comptroller
~.E~
~ t t ey
TLF:jlg\\S:\@SAI\351--400\382\638\Wrd\Change Orders\Change Order No 3,doc