Loading...
HomeMy WebLinkAboutPW CNT 04-19/Cng Order #1 ~.. . ". ~~ CHANGE ORDER # 1 DATED: March 11, 2005 TO: Jossart Brothers, Inc. 1682 Swan Road DePere, WI 54115 Your present contract with the City of Oshkosh, Contract No. and changed as follows: 04-19 , is hereby amended PART 1 NET INCREASE TO SECTION 1- SANITARY SEWER: NET INCREASE TO SECTION 11- WATER MAIN: $27,127.85 . $5,555.05 $32,682.90 PART 2 NET INCREASE TO SECTION II - STORM SEWER: NET DECREASE TO SECTION 111- SANITARY SEWER: NET DECREASE TO SECTION IV - WATER MAIN: NET DECREASE TO SECTION V - EROSION CONTROLISTORMWATER: $386.76 ($86.42) ($2,877.50) ($1,280.00) ($3,857.16) $28,825.74 NET INCREASE TO CONTRACT: Recommended: ~c..~ Director of Public Works ß lWí7fãe J I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. rVl H});AAV a tt-e/[J' - Comptroller , ,. . CONTRACT: 04-19 PART 1 AND 04-19 PART 2 CHANGE ORDER # 1 PART 1 SECTION I- SANITARY SEWER ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 1. Furnish and install approx. 20 linear feet of 8" Sanitary Sewer Relay, complete as specified, per linear foot 20.00 25.00 5.00 $75.00 $375.00 2. Furnish and install approx. 40 vertical feet of 8" Sanitary Sewer Drop, complete as specified, per vertical foot 40.00 39.50 -0.50 $325.00 ($162.50) 3. Furnish and install approx. 290 linear feet of 15" Sanitary Sewer Relay with aravel backfill (Fountain Avenue), complete as specified, per linear foot 290.00 288.42 -1.58 $195.00 ($308.10) 4. Furnish and install approx. 1,380 linear feet of 15" New Sanitary Sewer, complete as specified, with natural backfill. per linear foot 1,380.00 1 ,383.45 3.45 $71.00 $244.95 5. Furnish and install one (1) ..' 6" Sanitary Riser (1738 Fountain Avenue), complete as specified, lump sum 1.00 1.00 $700.00 6. Furnish and install approx. 117 vertical feet of std. Sanitary Manhole (4' Inside Diameter), complete as specified, in five (5) locations without castings, oer vertical foot 117.00 117.00 $100.00 7. Remove and salvage approx. 265 linear feet of chain link fencing as soecified, oer lin. ft. 265.00 132.50 -132.50 $2.00 ($265.00) 8. Furnish, install and maintain approx. 800 linear feet of Silt Fence Erosion Control, per linear foot 800.00 629.00 -171.00 $1.50 ($256.50) 9. Provide $375.00 to the City of Oshkosh for project management communications, complete as specified, lump sum 1.00 1.00 $375.00 SECTION I- (BID ITEMS 1.9). SUB-TOTALS $619.95 ($992.10) Page 1 . " . CONTRACT: 04-19 PART 1 AND 04-19 PART 2 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION I ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 1 Extra costs to bypass the existing 16" water main on Fountain Avenue to insure maintenance of water service and to provide a safer construction zone, and extra costs to provide large scale pumping of ground water at the existing lift station to dewater the existing trench along Fountain Avenue, lump sum 1.00 1.00 $27,500.00 $27,500.00 ADDITIONAL WORK: C.O. # 1 . (ITEM 1). SUB.TOTAL $27,500.00 .$0.00 NET INCREASE TO SECTION I . (PART 1) $27,127.85 PART 1 SECTION II. WATER MAIN ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 10. Furnish and install approx. 60 linear feet of 6" Ductile Iron Water Main w/poly wrap, complete as specified (fittings not included), per linear foot 60.00 54.00 -6.00 $38.00 ($228.00) 11. Furnish and install approx. 30 linear feet of 8" Ductile Iron Water Main w/poly wrap, complete as specified (fittings not included), per linear foot 30.00 14.00 -16.00 $40.00 ($640.00) 12. Furnish and install approx. 1,380 I inear feet of 16" Ductile Iron Water Main w/poly wrap, complete as specified, (fittings not included), per linear foot 1,380.00 1,380.50 0.50 $64.00 $32.00 13. Furnish and install approx. four (4), 6" Valves, complete as specified, each 4.00 4.00 $700.00 Page 2 '. CONTRACT: 04-19 PART 1 AND 04-19 PART 2 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE I., UNIT PRICE PRICE 14. Furnish and install approx. one (1), 8" Valve, complete as specified, each 1.00 1.00 $900.00 15. Furnish and install approx. two (2), 16" Valves in std. Water Valve Manhole, complete as specified with castings, each 2.00 3.00 1.00 $3,800.00 $3,800.00 16. Furnish and install approx. one (1),16" x 16" Tapping Valve and Sleeve in std. Water Valve Manhole, complete as specified with casting, each 1.00 0.00 -1.00 $14,000.00 $14,000.00) 17. Furnish and install approx. four (4), 16" x 6" Tees, complete as specified, each 4.00 4.00 $750.00 18. Furnish and install approx. one (1), 16" x 8" Tee, complete as specified, each 1.00 1.00 $750.00 19. Furnish and install approx. one (1), 8" x 6" Reducer, complete as specified, each 1.00 1.00 $175.00 20. Furnish and install approx. one (1), 8", 1/8 Bend, complete as specified, each 1.00 1.00 $250.00 21. Furnish and install approx. one (1), 6" Plug, complete as specified, each 1.00 1.00 $50.00 22. Furnish and install approx. one (1), 16" Plug, complete as specified, each 1.00 1.00 $300.00 23. Remove approx. 138 1.0. of trees and stumps, complete as specified, per inch diameter 138.00 174.00 36.00 $10.00 $360.00 24. Furnish and install approx. three (3) Hydrants, complete as specified, each 3.00 4.00 1.00 $1,750.00 $1,750.00 25. Provide $375.00 to the City of Oshkosh for project management communications, complete as specified, lump sum 1.00 1.00 $375.00 SECTION II- (BID ITEMS 10 - 25). SUB-TOTALS $5,942.00 ($14,868.00) ADDITIONAL WORK REQUIRED: C.O. # 1 . SECTION II Page 3 . . i . CONTRACT: 04-19 PART 1 AND 04-19 PART 2 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASEIN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 1 Relocate existing 16" water main along Fountain Avenue, 12/10/04 - 12/23/04, lump sum 1.00 1.00 $11,751.39 $11,751.39 2 Extra costs to lower new main under existing 8" sanitary in Future Street, 1/16/05, lump sum 1.00 1.00 $1,886.23 $1,886.23 3 Furnish and install 16" X 16" tea, lump sum 1.00 1.00 $843.43 $843.43 ADDITIONAL WORK: C.O. # 1 . (ITEMS 1 .2) . SUB-TOTAL $14,481.05 $0.00 NET INCREASE TO SECTION II - (PART 1) $5,555.05 NET INCREASE TO SECTIONS I, II. (PART 1) NET DECREASE TO SECTIONS I, II- (PART 1) $48,543.00 ($15,860.10) NET INCREASE TO CONTRACT 04-19 - (PART 1) $32,682.90 PART 2 SECTION II - STORM SEWER ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 5 Furnish and Install 12" RCP CL III or PVC w/Gravel Backfill, per linear foot 84.00 95.66 11.66 $36.00 $419.76 6 Furnish and Install 18" RCP CL III or PVC w/Gravel Backfill, per linear foot 57.00 56.25 -0.75 $44.00 ($33.00) 7 Furnish and Install Type 3 Std. Inlet, each 3.00 3.00 $900.00 8 Remove 18" Storm Sewer, per linear foot 8.00 8.00 $10.00 9 Remove Type 3 Standard Inlet, each 1.00 1.00 $100.00 SECTION II- (BID ITEMS 5 - 9) - SUB-TOTALS $419.76 ($33.00) $386.76 NET INCREASE TO SECTION II - (PART 2) Page 4 )' . ¡ . CONTRACT: 04-19 PART 1 AND 04-19 PART 2 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE PART 2 SECTION III . SANITARY SEWER ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASEIN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 10 Furnish and Install 8" PVC Sanitary Sewer wIG ravel Backfill, per linear foot 400.00 398.30 -1.70 $40.25 ($68.42) 11 Furnish and Install 4' Diameter Standard Manhole, per vertical foot 10.70 10.60 -0.10 $140.00 ($14.00) 12 Furnish and Install 4' Diameter Standard Manhole Over Existing 8" PVC Sanitary Sewer, per vertical foot 10.70 10.68 -0.02 $200.00 ($4.00) 13 N/A SECTION III. (BID ITEMS 10-13). SUB. TOTALS $0.00 ($86.42) NET DECREASE TO SECTION III . (PART 2) ($86.42) PART 2 SECTION IV -WATER MAIN ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 14 Furnish and Install 6" Ductile Iron Water Main w/Gravel Backfill and Polvwrap, per linear foot 49.00 44.00 -5.00 $35.00 ($175.00) 15 Furnish and Install 8" DI Water Main w/Gravel Backfill and Polywrap, per linear foot 790.00 725.00 -65.00 $38.50 ($2,502.50\ 16 Furnish and Install 16" x 8" Tapping Tee wNalve, each 1.00 1.00 $3,000.00 17 Furnish and Install 5' dia. Air Release Manhole with 8" Valve, each 1.00 1.00 $2,500.00 18 Furnish and Install 8"x6" Tee,each 2.00 2.00 $200.00 19 Furnish and Install 8" - 45 Dearee Bend, each 2.00 3.00 1.00 $200.00 $200.00 20 Furnish and Install 8" - 22% Dearee Bend, each 3.00 1.00 -2.00 $200.00 ($400.00) 21 Furnish and Install 6" Valve, each 2.00 2.00 $700.00 Page 5