HomeMy WebLinkAbout0114448-Building (foundation)
e
OSHKOSH
ON THE WATER
Job Address 1055-1057 BISMARCK AVE
CITY OF OSHKOSH
No
114448
BUILDING PERMIT - APPLICATION AND RECORD
Owner
TIMOTHY MCKEON
Create Date
06/03/2005
Designer
Ross Designs
Contractor
DEL TRITT CONSTRUCTION LLC
Category
123 - Foundation Permit Duplex
Plan G1-32-0605
Type
18 Building
R-2
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
VB
Size
Unfinished/Basement
0 Sq.Ft.
~ Sq. Ft.
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories 1
Baths 0
U Projection 1
Finished/Living
Canopies
0
Garage
~ Sq. Ft.
Signs
0
Foundation
8 Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units
0
# Structures
0
DUPLEX! Foundation Only - Early Start permit.
Use/Nature
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$15,000.00
Plan Approval
$0.00 Permit Fee Paid
$174.00 Park Dedication
$0.00
Issued By:
Date 06/03/2005
Final/O.P. 00/00/0000
U Permit Voided 1
Parcelld # 9060870070
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
6228 COUNTY RD N
Agent/Owner
PICKETT
WI 54964 - 9533 Telephone Number
589-4209
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.