Loading...
HomeMy WebLinkAbout0114448-Building (foundation) e OSHKOSH ON THE WATER Job Address 1055-1057 BISMARCK AVE CITY OF OSHKOSH No 114448 BUILDING PERMIT - APPLICATION AND RECORD Owner TIMOTHY MCKEON Create Date 06/03/2005 Designer Ross Designs Contractor DEL TRITT CONSTRUCTION LLC Category 123 - Foundation Permit Duplex Plan G1-32-0605 Type 18 Building R-2 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: VB Size Unfinished/Basement 0 Sq.Ft. ~ Sq. Ft. Rooms 0 Height 0 Ft. Bedrooms 0 Stories 1 Baths 0 U Projection 1 Finished/Living Canopies 0 Garage ~ Sq. Ft. Signs 0 Foundation 8 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 DUPLEX! Foundation Only - Early Start permit. Use/Nature of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $15,000.00 Plan Approval $0.00 Permit Fee Paid $174.00 Park Dedication $0.00 Issued By: Date 06/03/2005 Final/O.P. 00/00/0000 U Permit Voided 1 Parcelld # 9060870070 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 6228 COUNTY RD N Agent/Owner PICKETT WI 54964 - 9533 Telephone Number 589-4209 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.