Loading...
HomeMy WebLinkAbout0114352 B e OSHKOSH ON THE WATER Job Address 926 DEMPSEY TRL CITY OF OSHKOSH No 114352 BUILDING PERMIT - APPLICATION AND RECORD Owner CITY OF OSHKOSH SEWAGE PLANT Create Date 06/01/2005 Designer Contractor CAPELLE BROS & DIEDRICH Category 262 - City of Oshkosh-Alteration Plan 08-34-0605 Type 18 Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 Size Zoning Unfinished/Basement 0 Sq.Ft. ~ Sq. Ft. U Projection 1 Finished/Living Canopies 0 Garage ~ Sq. Ft. Signs 0 Foundation 8 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 City/ Interior alterations office area of transit garage as per plans. Use/Nature of Work HVAC Contractor Plumbing Contractor AHERN-GROSS INC. Electric Contractor Fees: Valuation $61,040.00 Plan Approval $0.00 Permit Fee Paid $0.00 Park Dedication $0.00 Issued By: Date 06/01/2005 Final/O.P. 00/00/0000 U Permit Voided 1 Parcelld # 0609680000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 253 N HICKORY ST Agent/Owner FOND DU LAC WI 54936 - 1274 Telephone Number 920-921-7830 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. BUILDINGS, HV AC, COMPLIANCE STATEMENT SBD-9720 This form is required to be submitted by the supervising professional (architect, engineer, HVAC designer or electrical designer) observing construction of projects within buildings with total areas 50,000 cubic feet or greater and bleachers (Comm 50.10/Comm 6.1.50). Failure to submit this form may result in penalties as specified in Coml)J.j'jO.:1§!Çomm 61.2.3. and/or local ordinances. This form must be submitted prior to the plan approval expiration date or afÍotner-s-uDlllittãCmaV"',,';, be required. \\., ii, . ¡i "\'7 r.~ ~....J General Instructions: Prior to the initial occupancy of new buildings or additions and thejfOinal9, c~upal"!.cy of altered existing buildings, submit this completed and signed form to: L 2 ( ;:005 . The municipal building inspection office and . . . Safety and Buildings, 10541N Ranch Road Hayward,\('{i,,54843"""'T OF ~ote: If the review. was done by the municipality, the compliance statement goes "drily tôtt1e'i'ìf¡j1JjpiP21j>,u}!?~~~r Inspector. A copy IS not needed by Safety & Buildings. Personal information you provide may be used for secondary purposes [Privacy Law, s. 15.04 (1)(m)]. 1. PROJECT INFORMATION: Please fill in the following with information from your plan approval letter. Transaction ID Number Site Number Site location (number & street) rJ5¡'¡'~~ ,;3US óA!l.M::£ ~~~~-~ II( City 0 Village 0 Town of mt.\~1.\ County of (¡,j11J .J¡;-~MO 2. PURPOSE OF THIS STATEMENT: (Check Box A, B, C, or D to indicate purpose and complete any other applicable boxes and information. Attach additional pages if necessary.) Check those which apply: 0 Building Object ID # 0 HVAC Object ID # 0 Lighting Object ID # 0 Partial Completion Description of Portion Completed AI IJt'Statement of Substantial Compliance To the best of my knowledge, belief, and based on onsite observation, construction of the following building and/or HVAC items applicable to this project have been completed in substantial compliance with the approved plans and specifications. 0 BUilDING/liGHTING ITEMS . 1. Structural system including submittal and erection of all building components (trusses, precast, metal building, etc.) 2. Fire protection systems (sprinklers, alarms, smoke detectors) designed, installed, and tested (including forward flow on back flow devices) by appropriately registered professionals 3. Shaft and stairway enclosure 4. Exits including exit and directional lights 5. Fire-resistive construction, enclosure of hazards, fire walls, iabeled doors, class 0 HVAC ITEMS of construction, fire stopped penetrations 6. Sanitation system (toilets, sinks, drinking facilities) 7. Barrier-free including Comm 18 elevators and lifts 8. Energy envelope requirements 9. All conditions of building plan approval and applicable variances The following items are not in compliance and must be addressed: 10. Exterior lighting & control requirements 11. interior lighting & control requirements , 2. All conditions of iighting plan approvai and applicable variances ,. HVAC system including final test 2. All conditions of HVAC plan approval and appilcable variances BI 0 Statement of Noncompliance Due to the following listed violations, this project is not ready for occupancy: CI 0 Supervising Professional Withdrawn From Project (Use A or B above to ,indicate project status as of this date.) OJ 0 Pr~ectAbandoned 3. SUPERVISING PROFESSIONAL SIGNATURE FOR: )( Building 0 HVAC 0 Lighting ~1I-I'-IeS FVïMAtJ t>lA Date VV()( no 'Zoot;" q 2.3$ 33. Name (Pleaq ~nt or~) u&W ~ ~ -""-, ",. - io~", -' 76 "-u - . 8111)09720 (IUMOM)