HomeMy WebLinkAbout2005-Building (roof over patio)
No114337
CITY OF OSHKOSH
OSHKOSHBUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
PATRICK/MARY B CONNORS
Job Address1075 MARICOPA DROwnerCreate Date05/31/2005
DesignerContractorERIC ABRAHAM CARPENTER
Category141 - Exterior RemodelingPlan
TypeBuildingSignCanopyFenceRaze
ZoningClass of Const:Size
Sq. Ft.Projection
Unfinished/Basement0Rooms0Height0Ft.
Finished/Living
0Sq. Ft.Bedrooms0StoriesCanopies0
Garage0Sq. Ft.Baths0Signs0
Poured ConcreteFloating SlabPierOther
Foundation
Concrete BlockPostTreated Wood
Occupancy PermitFlood PlainHeight Permit
Park Dedication# Dwelling Units0# Structures0
SFR/ Constructing a roof over the existing patio. The contractor states that piers with frost protection are previously installed to handel the
Use/Nature
loads. NO PLANS TO ISSUE PERMIT. All work shall comply with applicable codes. There will be no wall enclos ures.
of Work
ures.
HVAC ContractorPlumbing Contractor
Electric Contractor
Fees: Valuation$3,000.00Plan Approval$0.00Permit Fee Paid$32.00Park Dedication$0.00
05/31/200500/00/0000
Issued By:DateFinal/O.P.
Permit Voided
Parcel Id #1312760000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
SignatureDate
Agent/Owner
W8021 LINCOLN RDVAN DYNEWI549790000920-688-5076
Address-Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.