Loading...
HomeMy WebLinkAbout2005-Building (roof over patio) No114337 CITY OF OSHKOSH OSHKOSHBUILDING PERMIT - APPLICATION AND RECORD ON THE WATER PATRICK/MARY B CONNORS Job Address1075 MARICOPA DROwnerCreate Date05/31/2005 DesignerContractorERIC ABRAHAM CARPENTER Category141 - Exterior RemodelingPlan TypeBuildingSignCanopyFenceRaze ZoningClass of Const:Size Sq. Ft.Projection Unfinished/Basement0Rooms0Height0Ft. Finished/Living 0Sq. Ft.Bedrooms0StoriesCanopies0 Garage0Sq. Ft.Baths0Signs0 Poured ConcreteFloating SlabPierOther Foundation Concrete BlockPostTreated Wood Occupancy PermitFlood PlainHeight Permit Park Dedication# Dwelling Units0# Structures0 SFR/ Constructing a roof over the existing patio. The contractor states that piers with frost protection are previously installed to handel the Use/Nature loads. NO PLANS TO ISSUE PERMIT. All work shall comply with applicable codes. There will be no wall enclos ures. of Work ures. HVAC ContractorPlumbing Contractor Electric Contractor Fees: Valuation$3,000.00Plan Approval$0.00Permit Fee Paid$32.00Park Dedication$0.00 05/31/200500/00/0000 Issued By:DateFinal/O.P. Permit Voided Parcel Id #1312760000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. SignatureDate Agent/Owner W8021 LINCOLN RDVAN DYNEWI549790000920-688-5076 Address-Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.