Loading...
HomeMy WebLinkAbout0114289 B No114289 CITY OF OSHKOSH OSHKOSHBUILDING PERMIT - APPLICATION AND RECORD ON THE WATER WITZKE'S TAVERN LLC Job Address1700 OREGON STOwnerCreate Date05/03/2005 DesignerContractorVIENOLA BROS. Category240 - Other Non-ResidentialPlanO3-16-0405 TypeBuildingSignCanopyFenceRaze ZoningClass of Const:VBibcSize30x60 Sq. Ft.Projection Unfinished/Basement0Rooms0Height0Ft. Finished/Living 0Sq. Ft.Bedrooms0Stories1Canopies0 Garage0Sq. Ft.Baths0Signs0 Poured ConcreteFloating SlabPierOther Foundation Concrete BlockPostTreated Wood Occupancy PermitRequiredFlood PlainHeight Permit Park Dedication# Dwelling Units0# Structures1 Tavern / 30x60 Storage Building. * (Late Fee assessed, slab was poured prior to 5-4-05) Use/Nature of Work HVAC ContractorPlumbing Contractor Electric Contractor Fees: Valuation$27,500.00Plan Approval$0.00Permit Fee Paid$296.00Park Dedication$0.00 05/26/200500/00/0000 Issued By:DateFinal/O.P. Permit Voided Parcel Id #1400120000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. SignatureDate Agent/Owner PO BOX 8042OSHKOSHWI549038042303-0934 Address-Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPLIANCE CHECKLIST JOB LOCATION: 1700 OREGON STREET. WITZKE'S TAVERN PROPERTY OWNER/CONTRACTOR: VIENOLA BROS CONSTRUCTION DATA: 0 New Construction ~ Addition ZONING: C-3 0 Alteration TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) 4196SF BUILDING ADDITION. PARKING LOT EXPANSION. RAZE EX. GARAGE. BUILD NEW 1800SF STORAGE BLDG COMPLIANCE CHECKLIST DEFICIENT ouse- 0 Lot Width 0 Lot Area 0 Lot Area Per Famiily 0 Floodplain 0 Front Yard 0 Front Yard Side Street DEFICIENT 0 RearYard 0 Side Yards 0 Building Area 0 Parking Standards 0 Off-Street Loading Standards 0 Vision Clearance 0 Transitional Yard Standards 0 Parking Lot Lighting ~d gradmg'roeenstruetion efthe off stToetparking area in the 25 foot froRt lanl setback to W. H" -A¥eflue aod 5 f{Jot l'Jaffe< area from. parking let to th€ east is not permitted. If reeonstruetion is desired, ~must be seeared to permit the par1åflg area to prejeot iato tho 25 foot frent yard setbaok area and ~ lard parkin¡; let buffer setback area. REVISE PER 5/04/05 UPDATED PARKING LOT PLAN N€w-pertiOll of parking are fllU.;t pro'. ide a 5 foot setbae1c from. east property lifle. REVISE PER 5/04/05 llJPDATED PARKING LOT PLAN No information has been provided in regard to placement of rooftop or ground level mechanical equipment and locations of wall or ground mount utility boxes. These items shall be screened from view from the adjacent streets and residences, per section 30- 35(1)(5). No information provided regarding exterior lighting. Exterior building lighting must meet requirements of section 30-35(K). COMMENTS: . . . . DEFICIENT 0 Landscape Standards 0 Height 0 Conditions of Approval 0 Compliance with P.C. or BZA Conditions of Approval 0 Signage Standards 0 Mechanical Equip. Screening 0 Other REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approve aI/ plans, except the fol/owing: (1) Alterations or interior work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. -¥- j¿šJ APPROVED Plan Commission Action Required BOAlVariance(s) Required REVIEWED EIY: Matt TUCk6 0 DENIED ~Q 19t reGonstr~Gtion REVISE PER 5/04/05 PKL P~AN DATE: 03/31/200505/10/2005 2003 ...~ () ill m (II () z: eAS - U\ -I ill m m -I """ '2 f'ERATI",; >I!T ANT Loc.A - N.e OF II>TH - 0Rfe0I< ..41 ~ WILDI... ADDITIoN - MOO 0Ræ0N STREET OSHI<OSH, >'ß 11TH AVE. REV15fD -_11<6 LOr $/4105 oFF EXISTiN~ V r +:¿J, \"-- ~ I I ~NEJoIHEt>Œ"""" LEXISTI' TO RE> ~ " . . . . . . . . . . . . . I I """" EXISTIN~ : EXISTIN~ HOUSE ~ARA* - I I åv~ ~l~ 40'- Þ ~ PLAN APPROVED BY C!J1 OF ~HKOSH Staff:/ /?ý /- Date: S'-(¡}-Or SITE PLAN NORTH ~ I'. :>0"'" ",.s>' f'ROPOSfP eAAœ + ,mM EXISTINe eAAœ