Loading...
HomeMy WebLinkAbout0114255-Building (siding) CITY OF OSHKOSH No 114255 � �c��y OSHKOSH BUILDING PERMIT -APPLICATION AND RECOR '��� �' ON THE WATER ,�j � �� Job Address 1132 W 5TH AVE Owner MICHAEL E/SHELL BLAU C�� ate 05/25/2005 Designer Contractor OWNER Category 141 -Exterior Remodeling Plan Type � Building � Sign � Canopy � Fence � Raze � Zoning Class of Const: Size Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. ❑ Projection Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq.Ft. Baths 0 Signs 0 Foundation � Poured Concrete � Floating Slab � Pier 0 Other � Concrete Block � Post � Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature FR/Siding over the existing siding with new vinyl siding. J blocks are existing. No structural work. of Work I I i � i � HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $5,000.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00. Issued By: � Date 05/25/2005 Final/O.P. 00/00/0000 �� ❑ Permit Voided� Parcel Id#0608250000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work i described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. Signature � �� 1 � �`� Date x ��=0,� AgenUOwner Address 1132 W 5TH AVE OSHKOSH WI 54902 - 5730 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address,Permit Number,Type of Inspection(i.e.Footing,Service,Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.