Loading...
HomeMy WebLinkAbout0114207-Building (siding/windows) No114207 CITY OF OSHKOSH OSHKOSHBUILDING PERMIT - APPLICATION AND RECORD ON THE WATER TODD L/MELISSA DREIER Job Address1120 BUCHANAN AVEOwnerCreate Date05/23/2005 DesignerContractorOWNER Category141 - Exterior RemodelingPlan TypeBuildingSignCanopyFenceRaze ZoningClass of Const:Size Sq. Ft.Projection Unfinished/Basement0Rooms0Height0Ft. Finished/Living 0Sq. Ft.Bedrooms0StoriesCanopies0 Garage0Sq. Ft.Baths0Signs0 Poured ConcreteFloating SlabPierOther Foundation Concrete BlockPostTreated Wood Occupancy PermitNot RequiredFlood PlainHeight Permit Park Dedication# Dwelling Units0# Structures0 SFR/ Installing vinyl siding and 7 new windows. New headers will be installed for the windows, the headers are required to be sized to carry all Use/Nature the loads imposed. No electrical work will be done in association with the installation of the siding. of Work HVAC ContractorPlumbing Contractor Electric Contractor Fees: Valuation$4,000.00Plan Approval$0.00Permit Fee Paid$38.00Park Dedication$0.00 05/23/200500/00/0000 Issued By:DateFinal/O.P. Permit Voided Parcel Id #1604751400 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. SignatureDate Agent/Owner 1120 BUCHANAN AVEOSHKOSHWI549023408 Address-Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.