Loading...
HomeMy WebLinkAbout0114018-Building (shed) e OSHKOSH ON THE WATER Job Address 76 EVELINE ST CITY OF OSHKOSH No 114018 BUILDING PERMIT - APPLICATION AND RECORD Owner SUE E STEIN Create Date 05/11/2005 Designer Contractor OWNER Category 151 - New Utility Buildings-Sheds (Residential) Plan Type 18 Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning R Class of Const: VB Size 8' x 12' Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~ Sq. Ft. Bedrooms 0 Stories Garage ~ Sq. Ft. Baths 0 U Projection 1 Canopies 0 Signs 0 Foundation 8 Poured Concrete 0 Floating Slab 0 Pier 0 Other 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 SFR/ Construct 8' x 12' shed as per plan provided - Wood floor -structure is required to be anchored in place to resist wind loads. Use/Nature of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,000.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Issued By: Date 05/11/2005 Final/O.P. 00/00/0000 U Permit Voided 1 Parcelld # 0803160000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 76 EVELINE ST Agent/Owner OSHKOSH WI 54901 - 5428 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. r "~ (Ç ~o.X)~ - W60'D ~~ "'-'>/ m.,,"?>~A.)S- '7': Iii ',. ìC::, eJfuNt 15"J1;¡r-:J Q / 1? '.SSe;