Loading...
HomeMy WebLinkAbout0114140-Building (storage room)n OSHKOSH ON THE WATER Job Address 2737 HARRISON ST Designer CITY OF OSHKOSH No 114140 BUILDING PERMIT - APPLICATION AND RECORD Owner LEACH CO Contractor JAMES T KOMOROWSKI Create Date 05/18/2005 Category 211 - Alteration Industrial Plan Type 0 Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished /Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. Projection Finished /Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation 0 Poured Concrete 0 Floating Slab 0 Pier 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Not Required Flood Plain Park Dedication # Dwelling Units Use /Nature of Work 0 Other Height Permit 0 # Structures 0 Install approx 100 lin ft of steel stud walls to create a non - hazardous storage room. HVAC Contractor Electric Contractor Fees: Valuation $6,000.00 Plan Approval Issued By: Plumbing Contractor $0.00 Permit Fee Paid $50.00 Park Dedication $0.00 Date 05/18/2005 Final /O.P. 00 /00 /0000 LJ Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 3952 APPLE LN Agent /Owner OSHKOSH WI 54902 - 0000 Telephone Number Parcel Id # 1519600000 To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.