HomeMy WebLinkAbout05-134.doc
MAY 10,2005
(CARRIED 6-0
PURPOSE:
INITIATED BY:
LOST
05-1 34
RESOLUTION
LAID OVER
WITHDRAWN
AWARD BID / PUBLIC WORKS CONTRACT NO. 05-05/
CONCRETE PAVING / UTILITY PROJECT
31 5-041 0-7480-00000
31 7 -041 0-7480-03301
31 7 -041 0-7480-03302
31 7 -041 0-7480-03303
31 7 -041 0-7480-03305
532 -1 040-7480-03301
532 -1 040-7480-03303
532 -1 040-7480-03305
541-181 0-1799-00000
551-1910-1799-00000
561-2010-1799-00000
DEPARTMENT OF PUBLIC WORKS
WHEREAS, the City of Oshkosh has heretofore advertised for bids for concrete
paving/utility project; and
WHEREAS, upon the opening and tabulation of bids, it appears that the following is
the most advantageous bid:
VINTON CONSTRUCTION COMPANY
PO Box 1987
Manitowoc, WI 54221
Total Bid:
$5,370,647.70
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Oshkosh that the said bid is hereby accepted and the proper City officials are hereby
authorized and directed to enter into an appropriate agreement for the purpose of same, all
according to plans, specifications, and bid on file. Money for this purpose is hereby
appropriated from:
Accl. No.
Accl. No.
Accl. No.
Accl. No.
Accl. No.
Accl. No.
Accl. No.
Accl. No.
Accl. No.
Accl. No.
Accl. No.
street improvement fund expenditures
special assessment fund-streets
special assessment fund-sewer
special assessment fund-water
special assessment fund-storm
TIF #18-street
TIF #18-water
TIF #18-storm
water utility-construction in progress
sewer utility-construction in progress
storm water utility-construction in progress
BID TABULATION Contract 05-05
Concrete Paving/Utility Proiect
BIDDERS Name: Vinton Construction Company Dorner, Inc.
Address: P. O. Box 1987 E506 Luxemburg Road
Address: P. O. Box 129
Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129
Bid Time: 10:00 a.m. Phone #:
Item Description Units Unit Price Unit Total Unit Price Unit Total
Part I
SECTION I . CONCRETE PAVING
1. Approx. 14,100 square yards of
pavement removal, complete as
specified, per SQuare yard 14,100.00 $2.10 $29,610.00 $2.50 $35,250.00
2. Approx. 52,945 square feet of
sidewalk and driveway removal,
complete as specified, per square
foot 52,945.00 $0.61 $32,296.45 $0.50 $26,472.50
3. Approx. 24,250 cubic yards of
excavation, complete as specified,
per cubic vard 24,250.00 $5.96 $144,530.00 $7.75 $187,937.50
4. Approx. 41,765 square yards of
7" non-reinforced concrete pavement,
including integral curb, 5" base
material and grading, complete as
specified, per square yard
41,765.00 $24.17 $1,009,460.05 $25.35 $1,058,742.75
5. Approx. 1,255 square yards of
8" non-reinforced H.E.S. concrete
pavement, including integral curb, 6"
base material and grading, complete
as specified, per square yard 1,255.00 $42.15 $52,898.25 $30.60 $38,403.00
6. Approx. 17,720 square yards of 8"
doweled concrete pavement,
including integral curb and grading
(base in place), complete as
specified, per SQuare vard 17,720.00 $25.20 $446,544.00 $23.25 $411,990.00
7. Approx. 1,935 linear feet of 12" wide
radius curb head, complete as
specified, per linear foot 1,935.00 $2.00 $3,870.00 $2.80 $5,418.00
8. Approx. 763 linear feet of standard
30" curb & gutter, complete as
specified, oer linear foot 763.00 $15.70 $11,979.10 $21.00 $16,023.00
:::d
t::tj
(j)
0
r
c::
t--3
H
0
Z
0
VI
I
I-"
W
.¡::-.
1
BID TABULATION Contract 05-05
Concrete Paving/Utility Project
BIDDERS Name: Vinton Construction Company Dorner, Inc.
Address: P. O. Box 1987 E506 Luxemburg Road
Address: P. O. Box 129
Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129
Bid Time: 10:00 a.m. Phone #:
Item Description Units Unit Price Unit Total Unit Price Unit Total
9. Approx. 145 linear feet of standard
36" curb & gutter (mountable),
complete as specified, per linear foot
145.00 $18.20 $2,639.00 . $24.00 $3,480.00
10. Approx. 17,155 square feet of
4" concrete sidewalk, complete as
soecified, per square foot 17,155.00 $2.72 $46,661.60 $2.60 $44,603.00
11. Approx. 46,965 square feet of 6"
concrete sidewalk & driveway,
complete as specified, per square
foot 46,965.00 $2.97 $139,486.05 $2.85 $133,850.25
12. Approx. 2,820 square feet of 8"
concrete sidewalk & driveway,
complete as specified, per square
foot 2,820.00 $3.45 $9,729.00 $3.15 $8,883.00
13. Approx. 15 square yards of
3 1/4" asphaltic concrete driveway,
complete as specified, per square
yard 15.00 $59.59 $893.85 $59.40 $891.00
14. Approx. 280 square yards of
31/4" asphaltic concrete pavement,
complete as specified, per square
vard 280.00 $20.25 $5,670.00 $22.30 $6,244.00
15. Approx. 3,075 square yards of
3 1/4" asphaltic concrete transition,
with base, complete as specified, per
square yard 3,075.00 $20.45 $62,883.75 $21.50 $66,112.50
16. Approx. 480 square yards of
5" asphaltic concrete transition, with
base, complete as specified, per
square yard 480.00 $22.90 $10,992.00 $24.00 $11,520.00
17. Furnish and install approx. 9,065 tons
of crushed stone base course,
complete as specified, oer ton 9,065.00 $6.85 $62,095.25 $8.50 $77,052.50
2
BID TABULATION Contract 05-05
Concrete Paving/Utility Project
BIDDERS Name: Vinton Construction Company Dorner, Inc.
Address: P. O. Box 1987 E506 Luxemburg Road
Address: P. O. Box 129
Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221~1987 Luxemburg, WI 54217-0129
Bid Time: 10:00 a.m. Phone #:
Item Description Units Unit Price Unit Total Unit Price Unit Total
18. Approx. 2,725 linear feet of sawing,
complete as specified, per linear foot
2,725.00 $2.00 $5,450.00 $1,80 $4,905.00
19. Furnish and install approx.
525 pavement ties (epoxy coated),
complete as specified, each 525.00 $7.00 $3,675.00 $7.70 $4,042.50
20. Adjust approx. 287 manholes and
inlets, comolete as specified, each 287.00 $200.00 $57,400.00 $260.00 $74,620.00
21. No Bid Item 0.00 $0.00 $0.00
22. Furnish and install approx.
12 trees, complete as specified, each
12.00 $225.00 $2,700.00 $230.00 $2,760.00
23. Remove approx. 303 I.D. of trees
and stumps, complete as specified,
loer inch diameter 303.00 $25.00 $7,575.00 $25.00 $7,575.00
24. Furnish and install approx. 1,000
linear feet of 3" schedule 40 PVC
electrical conduit, complete as
specified, per linear foot 1,000.00 $5.25 $5,250.00 $5.35 $5,350.00
25. Furnish and install approx. 250 linear
feet of 3" schedule 80 PVC electrical
conduit, complete as specified, per
linear foot 250.00 $6.00 $1,500.00 $6.15 $1,537.50
26. Furnish and install one (1) 24" x 36"
CMP pull box, w/frame and lid,
comolete as soecified, lump sum 1.00 $450.00 $450.00 $460.00 $460.00
27. Terrace work on Baldwin Avenue,
comolete as soecified, lump sum 1.00 $2,500.00 $2,500.00 $5,850.00 $5,850.00
28. Terrace work on W. Fernau Avenue,
complete as specified, lump sum 1.00 $9,000.00 $9,000.00 $28,000.00 $28,000.00
29. Terrace work on Fernau Court,
complete as specified, lump sum 1.00 $2,500.00 $2,500.00 $11,300.00 $11,300.00
30. Terrace work on Florida Avenue,
complete as specified, lump sum 1.00 $4,000.00 $4,000.00 $6,900.00 $6,900.00
31. Terrace work on Franklin Street,
comolete as soecified, lump sum 1.00 $4,000.00 $4,000.00 $7,550.00 $7,550.00
3
BID TABULATION Contract 05-05
Concrete Paving/Utility Project
BIDDERS Name: Vinton Construction Company Dorner, Inc.
Address: P. O. Box 1987 E506 Luxemburg Road
Address: P. O. Box 129
Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129
Bid Time: 10:00 a.m. Phone #:
Item Description Units Unit Price Unit Total Unit Price Unit Total
32. Terrace work on Frederick Street,
(includes any necessary restoration
on Scott Avenue) complete as
specified, lumo sum 1.00 $2,000.00 $2,000.00 $2,500.00 $2,500.00
33. Terrace work on Georgia Street,
complete as specified, lump sum 1.00 $3,000.00 $3,000.00 $7,000.00 $7,000.00
34. Terrace work on Iowa Street,
complete as specified, lump sum 1.00 $4,000.00 $4,000.00 $7,250.00 $7,250.00
35. Terrace work on W. Irving Avenue,
complete as soecified, lumo sum 1.00 $4,000.00 $4,000.00 $5,350.00 $5,350.00
36. Terrace work on W. Lincoln Avenue,
complete as specified, lumo sum 1.00 $1,000.00 $1,000.00 $1,200.00 $1,200.00
37. Terrace work on W. Melvin Avenue,
complete as specified, lumo sum 1.00 $1,000.00 $1,000.00 $1,400.00 $1,400.00
38. Terrace work on Otter Avenue,
complete as specified, lump sum 1.00 $3,800.00 $3,800.00 $4,350.00 $4,350.00
39. No Bid Item 0.00 $0.00 $0.00
40. No Bid Item 0.00 $0.00 $0.00
41. Terrace work on Powers Street,
complete as specified, lump sum 1.00 $2,000.00 $2,000.00 $3,300.00 $3,300.00
42. Terrace work on W. 19th Avenue,
complete as specified, lump sum. 1.00 $2,000.00 $2,000.00 $4,250.00 $4,250.00
43. Provide $375.00 to the City of
Oshkosh for project management
communications, complete as
specified, lumo sum 1.00 $375.00 $375.00 $375.00 $375.00
SUB.TOTAL: SECTION 1.(Bid Items 1 - 43) $2,201,413.35 $2,330,698.00
SECTION II . STORM SEWER
44. Furnish and install approx.
3,700 linear feet of 12" Storm Sewer,
complete as specified, per linear foot
3,700.00 $35.75 $132,275.00 $38.00 $140,600.00
4
BID TABULATION Contract 05-05
Concrete Pavina/Utilitv Project
BIDDERS Name: Vinton Construction Company Dorner, Inc.
Address: P.O.Box1987 E506 Luxemburg Road
Address: P. O. Box 129
Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129
Bid Time: 10:00 a.m. Phone #:
Item Descriotion Units Unit Price Unit Total Unit Price Unit Total
45. Furnish and install approx.
470 linear feet of 12" RCP Class III
Storm Sewer, complete as specified,
per linear foot 470.00 $38.50 $18,095.00 $37.00 $17,390.00
46. Furnish and install approx. 2,550
linear feet of 15" Storm Sewer,
complete as specified, per linear foot
2,550.00 $34.75 $88,612.50 $36.00 $91,800.00
47. Furnish and install approx. 290 linear
feet of 18" Storm Sewer, complete as
specified, per linear foot
290.00 $37.50 $10,875.00 $48.00 $13,920.00
48. Furnish and install approx. 193 linear
feet of 18" RCP Class III Storm
Sewer, complete as specified, per
linear foot 193.00 $48.35 $9,331.55 $50.00 $9,650.00
49. Furnish and install approx.
239 linear feet of 24" Storm Sewer,
complete as specified, per linear foot
239.00 $48.00 $11,472.00 $50.00 $11,950.00
50. Furnish and install approx. 73 linear
feet of 33" RCP Class III Storm
Sewer, complete as specified, per
linear foot 73.00 $185.00 $13,505.00 $170.00 $12,410.00
51. Furnjsh and install approx. 15 linear
feet of 36" RCP Class III Storm
Sewer, complete as specified, per
linear foot 15.00 $370.00 $5,550.00 $313.00 $4,695.00
52. Furnish and install approx. 84 std.
Inlets (Type 3 with 18" sump) with
castings, complete as specified, each
84.00 $1,250.00 $105,000.00 $1,250.00 $105,000.00
53. Furnish and install approx. four (4)
modified Type 3 Inlets (w/o sump)
with castings, complete as specified,
each 4.00 $1,700.00 $6,800.00 $1,860.00 $7,440.00
5
BID TABULATION Contract 05-05
Concrete Paving/Utility Proiect
BIDDERS Name: Vinton Construction Company Dorner, Inc.
Address: P. O. Box 1987 E506 Luxemburg Road
Address: P. O. Box 129
Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129
Bid Time: 10:00 a.m. Phone #:
Item Description Units Unit Price Unit Total Unit Price Unit Total
54. Furnish and install approx. 119.00
vertical feet of std. Storm Manhole (4'
Inside Diameter) in 40 locations
without castings, complete as
soecified, oer vertical foot 119.00 $335.00 $39,865.00 $330.00 $39,270.00
55. Furnish and install approx. 26.00
vertical feet of std. Storm Manhole (5'
Inside Diameter) in seven (7)
locations without castings, complete
as specified, per vertical foot 26.00 $470.00 $12,220.00 $415.00 $10,790.00
56. Furnish and install approx. 16.60
vertical feetof std. Storm Manhole (6'
Inside Diameter) in four (4) locations
without castings, complete as
specified, per vertical foot 16.60 $430.00 $7,138.00 $450.00 $7,470.00
57. Furnish and install approx. 4.40
vertical feet of std. Storm Inlet
Manhole (4' Inside Diameter) in one
(1) location with casting, complete as
specified, oer vertical foot 4.40 $350.00 $1,540.00 $600.00 $2,640.00
58. Reconstruct approx. four (4) Storm
Manhole, complete as specified,
each 4.00 $990.00 $3,960.00 $800.00 $3,200.00
59. Reconstruct approx. two (2) Storm
Box Inlet Manhole with casting,
complete as specified, each 2.00 $2,200.00 $4,400.00 $1,640.00 $3,280.00
60. Reconstruct approx. one (1) Storm
Box Manhole, complete as specified,
each 1.00 $2,100.00 $2,100.00 $1,300.00 $1,300.00
61. Rebuild approx. 3.40 vertical feet of
Storm Inlet Manhole (4' Inside -
Diameter) in one (1) location with
base with casting, complete as
soecified, oer vertical foot 3.40 $500.00 $1,700.00 $650.00 $2,210.00
6
BID TABULATION Contract 05-05
Concrete PavinQ/Utilitv Project
BIDDERS Name: Vinton Construction Company Dorner, Inc.
Address: P. O. Box 1987 E506 Luxemburg Road
Address: P. O.Box 129
Bid Date: Tuesday, May 3, 2005 ,Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129
Bid Time: 10:00 a.m. Phone #:
Item Description Units Unit Price Unit Total Unit Price Unit Total
62. Rebuild approx. 3.50 vertical feet of
Storm Inlet Manhole (5' Inside
Diameter) in one (1) location with
base with casting, complete as
soecified, per vertical foot 3.50 $620.00 $2,170.00 $800.00 $2,800.00
63. Rebuild approx. 14.50 vertical feet of
Storm Manhole (4' Inside Diameter)
in four (4) locations, with base,
complete as specified, per vertical
foot 14.50 $470.00 $6,815.00 $385.00 $5,582.50
64. Rebuild approx. 4.30 vertical feet of
Storm Manhole (5' Inside Diameter)
in one (1) locations, with base,
complete as specified, per vertical
foot 4.30 $575.00 $2,472.50 $450.00 $1,935.00
65. Rebuild approx. 7.60 vertical feet of
Storm Manhole (6' Inside Diameter)
in one (1) location, with base,
complete as specified, per vertical
foot 7.60 $480.00 $3,648.00 $550.00 $4,180.00
66. Furnish and install approx. 242
6" Storm Laterals, complete as
specified, each 242.00 $870.00 $210,540.00 $715.00 $173,030.00
67. Furnish and install approx. three (3)
Neenah R-3067 Inlet casting
w/diagonal grate, complete as
specified, each 3.00 $425.00 $1,275.00 $870.00 $2,610.00
68. Abandon approx. 84 Inlets or
Manholes, complete as specified,
each 84.00 $250.00 $21,000.00 $360.00 $30,240.00
69. Furnish, install and maintain Type "C"
Inlet Protection in 204 locations,
complete as specified, each . 204.00 $35.00 $7,140.00 $50.00 $10,200.00
7
BID TABULATION Contract 05-05
Concrete Paving/Utility Project
BIDDERS Name: Vinton Construction Company Dorner, Inc.
Address: P. O. Box 1987 E506 Luxemburg Road
Address: P. O. Box 129
Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129
Bid Time: 10:00 a.m. Phone#:
Item Description Units Unit Price Unit Total Unit Price Unit Total
70. Provide $375.00 to the City of
Oshkosh for project management
communications, complete as
soecified, fume sum 1.00 $375.00 $375.00 $375.00 $375.00
SUB.TOTAL: SECTION II. (Bid Items 44 - 70) $729,874.55 $715,967.50
SECTION III . SANITARY SEWER
71. Furnish and install approx. 5,900
linear feet of 8" Sanitary Sewer
(Relay/New), complete as specified,
per linear foot 5,900.00 $51.25 $302,375.00 $60.00 $354,000.00
72. Furnish and install approx. 2,590
linear feet of 10" Sanitary Sewer
Relay, complete as specified, per
linear foot 2,590.00 $61.25 $158,637.50 $70.00 $181,300.00
73. Furnish and install approx. 360 linear
feet of 12" Sanitary Sewer (New) with
Natural Backfill (through South Park),
complete as specified, per linear foot
360.00 $45.50 $16,380.00 $64.00 $23,040.00
74. Furnish and install approx. 2,375
linear feet of 12" Sanitary Sewer
Relay with Gravel Backfill, complete
as specified, oer linear foot 2,375.00 $63.95 $151,881.25 $80.00 $190,000.00
75. Furnish and install approx.
420 linear feet of 15" Sanitary Sewer
Relay (Ohio Street), complete as
specified, per linear foot 420.00 $78.75 $33,075.00 $91.00 $38,220.00
76. Furnjsh and install approx.
925 linear feet of 18" Sanitary Sewer
Relay, complete as specified, per
linear foot 925.00 $85.00 $78,625.00 $90.00 $83,250.00
77. Excavate approx. 150 cubic yards of
rock, complete as specified, per cubic
yard 150.00 $120.00 $18,000.00 $150.00 $22,500.00
8
BID TABULATION Contract 05.05
Concrete Paving/Utility Project
BIDDERS Name: Vinton Construction Company Dorner, Inc.
Address: P. O. Box 1987 E506 Luxemburg Road
. Address: P. O. Box 129
Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129
Bid Time: 10:00 a.m. Phone #:
Item Description Units Unit Price Unit Total Unit Price Unit Total
78. Furnish and install approx. 448
vertical feet of std. Sanitary Manhole
(4' Inside Diameter) in 65 locations,
complete as specified, without
casting, per vertical foot 448.00 $175.00 $78,400.00 $170.00 $76,160.00
79. Reconstruct approx. two (2) Sanitary
Manhole, complete as specified,
each 2.00 $850.00 $1,700.00 $650.00 $1,300.00
80. Reconnect approx. 16 Sanitary
Laterals, complete as specified, each
16.00 $316.00 $5,056.00 $310.00 $4,960.00
81. Furnish and install approx. 5,720
linear feet of 6" Sanitary Lateral
New/Relay, complete as specified,
per linear foot 5,720.00 $42.00 $240,240.00 $44.00 $251,680.00
82. Remove (existing asphalt over
concrete) and replace (with five (5")
inches of asphalt) approx. 350
square yards of asphalt pavement on
Ohio Street, complete as specified
with sawing, per square yard
350.00 $28.21 $9,873.50 $35.00 $12,250.00
83. Abandon approx. 18 Sanitary
Manholes, complete as specified,
each 18.00 $325.00 $5,850.00 $510.00 $9,180.00
84. Plug approx. four (4) Sanitary
Sewers, complete as specified, each
4.00 $110.00 $440.00 $250.00 $1,000.00
85. Terrace work on W. South Park
Avenue, through South Park and
Ohio Street, complete as specified,
lump sum 1.00 $3,800.00 $3,800.00 $4,400.00 $4,400.00
86. Provide $375.00 to the City of
Oshkosh for project management
communications, complete as
specified, lump sum 1.00 $375.00 $375.00 $375.00 $375.00
9
BID TABULATION Contract OS-OS
Concrete Paving/Utility Project
BIDDERS Name: Vinton Construction Company Dorner, Inc.
Address: P. O. Box 1987 E506 Luxemburg Road
Address: P. O. Box 129
Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129
Bid Time: 10:00 a.m. Phone #:
Item Description Units Unit Price Unit Total Unit Price Unit Total
SUB-TOTAL: SECTION III. (Bid Items 71 - 86) $1,104,708.25 $1,253,615.00
SECTION IV - WATER MAIN
87. Furnish and install approx. 15 linear
feet of 4" Ductile Iron Water Main
w/poly wrap, complete as specified
(fittings not included), per linear foot 15.00 $100.00 $1,500.00 $90.00 $1,350.00
88. Furnish and install approx. 415 linear
feet of 6" Ductile Iron Water Main
w/poly wrap, complete as specified
(fittings not included), per linear foot
415.00 $70.00 $29,050.00 $70.00 $29,050.00
89. Furnish and install approx. 7,605
linear feet of 8" Ductile Iron Water
Main w/poly wrap, complete as
specified, (fittings not included), per
linear foot 7,605.00 $60.70 $461,623.50 $55.00 $418,275.00
90. Furnish and install approx. 1,250
linear feet of 12" Ductile Iron Water
Main w/poly wrap, complete as
specified (fittings not included), per
linear foot 1,250.00 $76.95 $96,187.50 $60.00 $75,000.00
91. No Bid Item 0.00 $0.00 $0.00
92. Excavate approx. 75 cubic yards of
rock, complete as specified, per cubic
Ivard 75.00 $120.00 $9,000.00 $150.00 $11,250.00
93. Lower existing 8" Water Main at W.
Melvin Avenue/Frederick Street
intersection, lump sum 1.00 $4,300.00 $4,300.00 $5,300.00 $5,300.00
94. Reconnect approx. ten (10), 1" -
1 1/4" Water Services, complete as
specified,each 10.00 $425.00 $4,250.00 $525.00 $5,250.00
10
BID TABULATION Contract 05-05
Concrete Paving/Utility Project
BIDDERS Name: Vinton Construction Company Dorner, Inc.
Address: P. O. Box 1987 E506 Luxemburg Road
Address: P. O. Box 129
Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129
Bid Time: 10:00 a.m. Phone #:
Item Descriotion Units Unit Price Unit Total Unit Price Unit Total
95. Furnish and install approx. 4,825
linear feet of 1" Water Service
(Relay/New), complete as specified,
not including corporation and stop
box, per linear foot 4,825.00 $31.00 $149,575.00 $36.00 $173,700.00
96. Furnish and install approx. 214,
1" corporation and stop box with rod,
complete as specified, each 214.00 $250.00 $53,500.00 $465.00 $99,510.00
97. Relay 2" Water Service to 761 Florida
Avenue (Wesley Methodist Church),
complete as specified with new stop
box, lump sum 1.00 $1,665.00 $1,665.00 $1,500.00 $1,500.00
98. Furnish and install approx. one (1),
8" Plug, complete as specified, each
1.00 $85.00 $85.00 $90.00 $90.00
99. No Bid Item 0.00 $0.00 $0.00
100. No Bid Item 0.00 $0.00 $0.00
101. No Bid Item 0.00 $0.00 $0.00
102. Furnish and install approx. 21,
8" x 6" Tees, complete as specified,
each 21.00 $271.00 $5,691.00 $305.00 $6,405.00
103. Furnish and install approx. five (5),
8" x 8" Tees, complete as specified,
each 5.00 $260.00 $1,300.00 $285.00 $1,425.00
104. Furnish and install approx. five (5),
12" x 6" Tees, complete as specified,
each 5.00 $427.00 $2,135.00 $550.00 $2,750.00
105. Furnish and install approx. six (6),
12" x 8" Tees, complete as specified,
each 6.00 $395.00 $2,370.00 $510.00 $3,060.00
106. Furnish and install approx. four (4),
18" x 6" Tees, complete as specified,
each 4.00 $1.00 $4.00 $0.00 $0.00
107. Furnish and install approx. three (3),
8" x 4" Reducers, complete as
soecified,each 3.00 $125.00 $375.00 $150.00 $450.00
11
BID TABULATION Contract 05-05
Concrete Pavinq/Utilitv Project
BIDDERS Name: Vinton Construction Company Dorner, Inc.
Address: P. O. Box 1987 E506 Luxemburg Road
Address: P. O. Box 129
Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129
Bid Time: 10:00 a.m. Phone #:
Item Description Units Unit Price Unit Total Unit Price Unit Total
108. Furnish and install approx. 15,
8" x 6" Reducers, complete as
soecified, each 15.00 $150.00 $2,250.00 $165.00 $2,475.00
109. Furnish and install approx. one (1)
12" x 8" Reducer, complete as
specified, each 1.00 $260.00 $260.00 $250.00 $250.00
110. Furnish and install approx.
one (1), 8" x 8" Cross, complete as
specified, each 1.00 $342.75 $342.75 $385.00 $385.00
111. No Bjd Item 0.00 $0.00 $0.00
112. Furnish and install approx. three
(3), 6" - 11.25 degree Bends,
comolete as specified, each 3.00 $225.00 $675.00 $150.00 $450.00
113. Furnish and install approx. six (6),
4" - 45 degree Bends, complete as
specified, each 6.00 $190.00 $1,140.00 $120.00 $720.00
114. Furnish and install approx. 32,
6" - 45 degree Bends, complete as
specified, each 32.00 $200.00 $6,400.00 $155.00 $4,960.00
115. Furnish and install approx. 18,
8" - 45 degree Bends, complete as
specified, each 18.00 $230.00 $4,140.00 $190.00 $3,420.00
116. Furnish and install approx. six (6),
12" - 45 degree Bends, complete as
specified, each 6.00 $370.00 $2,220.00 $340.00 $2,040.00
117. No Bid Item 0.00 $0.00 $0.00
118. No Bid Item 0.00 $0.00 $0.00
119. Furnish and install approx. 25,
6" Valves, complete as specified,
each 25.00 $660.00 $16,500.00 $655.00 $16,375.00
120. Furnish and install approx. 21,
8" Valves, complete as specified,
each 21.00 $870.00 $18,270.00 $880.00 $18,480.00
12
BID TABULATION Contract 05-05
Concrete Paving/Utility Project
BIDDERS Name: Vinton Construction Company Dorner, Inc.
Address: P. O. Box 1987 E506 Luxemburg Road
Address: P. O. Box 129
Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129
Bid Time: 10:00 a.m. Phone #: .
Item Description Units Unit Price Unit Total Unit Price Unit Total
121. Furnish and install approx. three (3),
12" Valves in Std. Water Valve
Manhole, complete as specified,
each 3.00 $3,850.00 $11,550.00 $3,700.00 $11,100.00 .
122. No Bid Item 0.00 $0.00 $0.00
123. Furnish and install approx. nine (9),
6" x 6" Tapping Valves and Sleeves,
complete as soecified, each 9.00 $1,500.00 $13,500.00 $2,150.00 $19,350.00
124. Furnish and install approx. one (1),
8" x 8" Tapping Valves and Sleeves,
complete as specified, each 1.00 $1,700.00 $1,700.00 $2,700.00 $2,700.00
125. Furnish and install approx. three (3),
12" x 6" Tapping Valves and Sleeves,
complete as specified, each
3.00 $1,600.00 $4,800.00 $2,800.00 $8,400.00
126. Reconstruct approx. one (1) Std.
Water Valve Manhole, complete as
specified, each 1.00 $1,500.00 $1,500.00 $1,160.00 $1,160.00
127. Furnish and install approx. 23
Hydrants, complete as specified,
each 23.00 $1,850.00 $42,550.00 $1,750.00 $40,250.00
128. Abandon 6" Water Main on Baldwin
Avenue, complete as specified, lump "
sum 1.00 $2,000.00 $2,000.00 $3,500.00 $3,500.00
129. Abandon 6" Water Main on Florida
Avenue, complete as specified, lump
sum 1.00 $2,000.00 $2,000.00 $3,000.00 $3,000.00
130. Abandon 6" Water Main on Franklin
Street, complete as specified, lump
sum 1.00 $1,200.00 $1,200.00 $5,000.00 $5,000.00
131. Abandon 6" Water Main on Frederick
Street, complete as specified, lump
sum 1.00 $2,000.00 $2,000.00 $3,000.00 $3,000.00
132. Abandon 6" Water Main on Georgia
Street, complete as specified, lump
sum 1.00 $3,000.00 $3,000.00 $5,000.00 $5,000.00
13
BID TABULATION Contract 05-05
Concrete PavinQ/Utilitv Project
BIDDERS Name: Vinton Construction Company Dorner, Inc.
Address: P. O. Box 1987 E506 Luxemburg Road
Address: P. O. Box 129
Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129
Bid Time: 10:00 a.m. Phone #:
Item Description Units Unit Price Unit Total Unit Price Unit Total
133. Abandon 6" Water Main on Iowa
Street, complete as specified, lump
sum 1.00 $2,800.00 $2,800.00 $4,500.00 $4,500.00
134. Abandon 8" Water Main on W. Irving
Avenue, complete as specified, lump
sum 1.00 $1,020.00 $1,020.00 $4,500.00 $4,500.00
135. Abandon 6" Water Main on W.
Lincoln Avenue, complete as
specified, lump sum 1.00 $1,020.00 $1,020.00 $1,500.00 $1,500.00
136. Abandon 6" Water Main on W. Melvin
Avenue, complete as specified, lump
sum 1.00 $1,000.00 $1,000.00 $1,500.00 $1,500.00
137. Abandon 6" Water Main on Otter
Avenue, complete as specified, lump
sum 1.00 $1,500.00 $1,500.00 $4,000.00 $4,000.00
138. No Bid Item 0.00 $0.00 $0.00 $0.00
139. Abandon 6" Water Main on Powers
Street, complete as specified, lump
sum 1.00 $1,340.00 $1,340.00 $1,500.00 $1,500.00
140. Abandon 6" Water Main on W. 19th
Avenue, complete as specified, lump
sum 1.00 $1,500.00 $1,500.00 $2,000.00 $2,000.00
141. Provide $375.00 to the City of
Oshkosh for project management
communications, complete as
specified, lump sum 1.00 $375.00 $375.00 $375.00 $375.00
SUB-TOTAL: SECTION IV - (Bid Items 87 -141 $971,163.75 $1,006,255.00
I
TOTAL CONTRACT 05-05 (Part I) - (Bid Items 1 -141) $5,007,159.90 $5,306,535.50
CONTRACT 05-05 (Part II)
Southwest Industrial Park - Global Parkway Extension
14
BID TABULATION Contract 05-05
Concrete PavinQ/Utility Project
BIDDERS Name: Vinton Construction Company Dorner, Inc.
Address: P. O. Box 1987 E506 Luxemburg Road
Address: P. O. Box 129
Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129
Bid Time: 10:00 a.m. Phone #:
Item Description Units Unit Price Unit Total Unit Price Unit Total
Item Description Units UnitTotal Unjt Price Unit Total
Part II
SECTION I - STREET WORK
1. Excavate approx. 750 cubic yards for
roadway, complete as specified, per
cubic vard 750.00 $3.50 $2,625.00 $7.18 $5,385.00
2. Furnish and install approx. 2,500 tons
of crushed stone base course,
comolete as soecified, per ton 2,500.00 $7.15 $17,875.00 $8.05 $20,125.00
3. Terrace work on the Global Parkway,
complete as specified, lump sum
1.00 $5,300.00 $5,300.00 $5,650.00 $5,650.00
4. Allowance for project management
communication, lump sum 1.00 $375.00 $375.00 $375.00 $375.00
SUB-TOTAL: SECTION 1- (Bid Items 1 - 4) $26,175.00 $31,535.00
SECTION II - STORM SEWER
5. Furnish and install approx. 90 linear
feet of 12" RCP Class III or PVC
Storm Sewer with natural backfill,
complete as specified, per linear foot
90.00 $32.55 $2,929.50 $25.00 $2,250.00
6. Furnish and install approx. 230 linear
feet of 15" RCP Class III or PVC
Storm Sewer with natural backfill,
complete as specified, per linear foot
230.00 $28.20 $6,486.00 $25.00 $5,750.00
7. Furnish and install approx. 15 linear
feet of 18" RCP Class III or PVC
Storm Sewer with natural backfill,
complete as specified, per linear foot
15.00 $41.00 $615.00 $73.00 $1,095.00
15
BID TABULATION Contract 05-05
Concrete Paving/Utility Project
BIDDERS Name: Vinton Construction Company Dorner, Inc.
Address: P. O. Box 1987 E506 Luxemburg Road
Address: P. O. Box 129
Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129
Bid Time: 10:00 a.m. Phone #:
Item Description Units Unit Price Unit Total Unit Price Unit Total
8. Furnish and install approx. 250 linear
feet of 30" RCP Class III Storm
Sewer with natural backfill, complete
as specified, per linear foot
. 250.00 $48.55 $12,137.50 $43.00 $10,750.00
9. Furnish and install approx. 270 linear
feet of 36" RCP Class III Storm
Sewer with natural backfill, complete
as specified, per linear foot
270.00 $68.60 $18,522.00 $56.00 $15,120.00
10. Furnish and install approx. 40 linear
feet of 42" RCP Class IV Storm
Sewer with natural backfill, complete
as specified, per linear foot 40.00 $90.00 $3,600.00 $82.00 $3,280.00
11. Furnish and install approx. 200 linear
feet of 48" RCP Class IV Storm
Sewer with natural backfill, complete
as specified, per linear foot
200.00 $98.45 $19,690.00 $85.00 $17,000.00
12. Furnish and install approx. 90 linear
feet of 76" x 48" RCP HE Class IV
Storm Sewer with natural backfill,
complete as specified, per linear foot
90.00 $196.45 $17,680.50 $188.00 $16,920.00
13. Furnish and install approx. six (6)
Type 3 Standard Inlet with 18" sump
with casting, complete as specified,
each 6.00 $1,100.00 $6,600.00 $1,150.00 $6,900.00
14. Furnish and install approx 17 vertical
feet of 6' Diameter Storm Manhole
with casting, complete as specified,
per vertical foot 17.00 $500.00 $8,500.00 $630.00 $10,710.00
15. Furnish and install approx six (6)
vertical feet of 8' Diameter Storm
Manhole with casting, complete as
specified, per vertical foot 6.00 $676.80 $4,060.80 $800.00 $4,800.00
16
BID TABULATION Contract 05-05
Concrete Paving/Utility Proiect
BIDDERS Name: Vinton Construction Company Dorner, Inc.
Address: P. O. Box 1987 E506 Luxemburg Road /
Address: P. O. Box 129
Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129
Bid Time: 10:00 a.m. Phone #:
Item Description Units Unit Price Unit Total Unit Price Unit Total
16. Furnish and install approx. one (1)
30" RCP Endwall, complete as
specified, each 1.00 $1,560.00 $1,560.00 $700.00 $700.00
17. Furnish and install approx. one (1)
42" RCP Endwall, complete as
specified, each 1.00 $2,165.00 $2,165.00 $1,250.00 $1,250.00
18. Furnish and install approx. one (1)
48" RCP Endwall, complete as
specified, each 1.00 $2,425.00 $2,425.00 $1,350.00 $1,350.00
19. Furnish and install approx. two (2)
76" x 48" RCP Endwalls, complete as
specified, each 2.00 $5,165.00 $10,330.00 $2,900.00 $5,800.00
20. Allowance for project management
communication, lump sum 1.00 $375.00 $375.00 $375.00 $375.00
SUB-TOTAL: SECTION II- (Bid Items 5 - 20) $117,676.30 $104,050.00
SECTION III - WATER MAIN
21. Furnish and install approx. 50 linear
feet of 6" Ductile Iron Water Main
with natural backfill and poly wrap.
complete as specified, per linear foot
50.00 $34.95 $1,747.50 $30.00 $1,500.00
22. Furnish and install approx. 820 linear
feet of 10" Ductile Iron Water Main
with natural backfill and polv wrap.
complete as specified, per linear foot
820.00 $40.00 $32,800.00 $33.00 $27,060.00
23. Furnish and install approx. one (1) 5'
Diameter Valve and Air Release
Manhole on a 10" diameter water
main, complete as specified, each 1.00 $3,924.00 $3,924.00 $4,050.00 $4,050.00
24. Furnish and install approx. two (2)
10" x 6" Tee, complete as specified,
each 2.00 $310.00 $620.00 $325.00 $650.00
17
BID TABULATION Contract OS-OS
Concrete Paving/Utility Project
BIDDERS Name: Vinton Construction Company Dorner, Inc.
Address: P. O. Box 1987 E506 Luxemburg Road
Address: P. O. Box 129
Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129
Bid Time: 10:00 a.m. Phone #:
Item Description Units Unit Price Unit Total Unit Price Unit Total
25. Furnish and install approx. one (1)
10" x 6" Reducer, complete as
specified, each 1.00 $200.00 $200.00 $180.00 $180.00
26. Furnish and install approx. one (1)
10" -111/4 degree Bend, complete
as specified, each 1.00 $330.00 $330.00 $235.00 $235.00
27. Furnish and install approx. one (1)
10" - 221/2 degree Bend, complete
as specified, each 1.00 $330.00 $330.00 $235.00 $235.00
28. Furnish and install approx. two (2) 6"
Gate Valve and Box, complete as
specified, each 2.00 $660.00 $1,320.00 $655.00 $1,310.00
29. Furnish and install approx. two (2)
10" Gate Valves and Boxes,
complete as specified, each 2.00 $1,170.00 $2,340.00 $1,200.00 $2,400.00
30. Furnish and install approx. three (3)
Fire Hydrants, complete as specified,
each 3.00 $1,860.00 $5,580.00 $1,700.00 $5,100.00
31. Furnish and install approx. one (1)
connection to existing 10" Diameter
Water Main, complete as specified,
each 1.00 $100.00 $100.00 $1,450.00 $1,450.00
32. Allowance for project management
communication, lump sum 1.00 $375.00 $375.00 $375.00 $375.00
SUB-TOTAL: SECTION III - (Bid Items 21 - 32) $49,666.50 $44,545.00
SECTION IV - Stormwater Management/Miscellaneous
33. Excavate and grade approx. 30,500
cubic yards of stormwater
management ponds, complete as
specified, per cubic yard 30,500.00 $2.50 $76,250.00 $2.55 $77,775.00
34. Furnish and install approx. 100
square yards of medium Riprap,
complete as specified, per square
yard 100.00 $21.00 $2,100.00 $21.50 $2,150.00
18