Loading...
HomeMy WebLinkAbout05-134.doc MAY 10,2005 (CARRIED 6-0 PURPOSE: INITIATED BY: LOST 05-1 34 RESOLUTION LAID OVER WITHDRAWN AWARD BID / PUBLIC WORKS CONTRACT NO. 05-05/ CONCRETE PAVING / UTILITY PROJECT 31 5-041 0-7480-00000 31 7 -041 0-7480-03301 31 7 -041 0-7480-03302 31 7 -041 0-7480-03303 31 7 -041 0-7480-03305 532 -1 040-7480-03301 532 -1 040-7480-03303 532 -1 040-7480-03305 541-181 0-1799-00000 551-1910-1799-00000 561-2010-1799-00000 DEPARTMENT OF PUBLIC WORKS WHEREAS, the City of Oshkosh has heretofore advertised for bids for concrete paving/utility project; and WHEREAS, upon the opening and tabulation of bids, it appears that the following is the most advantageous bid: VINTON CONSTRUCTION COMPANY PO Box 1987 Manitowoc, WI 54221 Total Bid: $5,370,647.70 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Accl. No. Accl. No. Accl. No. Accl. No. Accl. No. Accl. No. Accl. No. Accl. No. Accl. No. Accl. No. Accl. No. street improvement fund expenditures special assessment fund-streets special assessment fund-sewer special assessment fund-water special assessment fund-storm TIF #18-street TIF #18-water TIF #18-storm water utility-construction in progress sewer utility-construction in progress storm water utility-construction in progress BID TABULATION Contract 05-05 Concrete Paving/Utility Proiect BIDDERS Name: Vinton Construction Company Dorner, Inc. Address: P. O. Box 1987 E506 Luxemburg Road Address: P. O. Box 129 Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129 Bid Time: 10:00 a.m. Phone #: Item Description Units Unit Price Unit Total Unit Price Unit Total Part I SECTION I . CONCRETE PAVING 1. Approx. 14,100 square yards of pavement removal, complete as specified, per SQuare yard 14,100.00 $2.10 $29,610.00 $2.50 $35,250.00 2. Approx. 52,945 square feet of sidewalk and driveway removal, complete as specified, per square foot 52,945.00 $0.61 $32,296.45 $0.50 $26,472.50 3. Approx. 24,250 cubic yards of excavation, complete as specified, per cubic vard 24,250.00 $5.96 $144,530.00 $7.75 $187,937.50 4. Approx. 41,765 square yards of 7" non-reinforced concrete pavement, including integral curb, 5" base material and grading, complete as specified, per square yard 41,765.00 $24.17 $1,009,460.05 $25.35 $1,058,742.75 5. Approx. 1,255 square yards of 8" non-reinforced H.E.S. concrete pavement, including integral curb, 6" base material and grading, complete as specified, per square yard 1,255.00 $42.15 $52,898.25 $30.60 $38,403.00 6. Approx. 17,720 square yards of 8" doweled concrete pavement, including integral curb and grading (base in place), complete as specified, per SQuare vard 17,720.00 $25.20 $446,544.00 $23.25 $411,990.00 7. Approx. 1,935 linear feet of 12" wide radius curb head, complete as specified, per linear foot 1,935.00 $2.00 $3,870.00 $2.80 $5,418.00 8. Approx. 763 linear feet of standard 30" curb & gutter, complete as specified, oer linear foot 763.00 $15.70 $11,979.10 $21.00 $16,023.00 :::d t::tj (j) 0 r c:: t--3 H 0 Z 0 VI I I-" W .¡::-. 1 BID TABULATION Contract 05-05 Concrete Paving/Utility Project BIDDERS Name: Vinton Construction Company Dorner, Inc. Address: P. O. Box 1987 E506 Luxemburg Road Address: P. O. Box 129 Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129 Bid Time: 10:00 a.m. Phone #: Item Description Units Unit Price Unit Total Unit Price Unit Total 9. Approx. 145 linear feet of standard 36" curb & gutter (mountable), complete as specified, per linear foot 145.00 $18.20 $2,639.00 . $24.00 $3,480.00 10. Approx. 17,155 square feet of 4" concrete sidewalk, complete as soecified, per square foot 17,155.00 $2.72 $46,661.60 $2.60 $44,603.00 11. Approx. 46,965 square feet of 6" concrete sidewalk & driveway, complete as specified, per square foot 46,965.00 $2.97 $139,486.05 $2.85 $133,850.25 12. Approx. 2,820 square feet of 8" concrete sidewalk & driveway, complete as specified, per square foot 2,820.00 $3.45 $9,729.00 $3.15 $8,883.00 13. Approx. 15 square yards of 3 1/4" asphaltic concrete driveway, complete as specified, per square yard 15.00 $59.59 $893.85 $59.40 $891.00 14. Approx. 280 square yards of 31/4" asphaltic concrete pavement, complete as specified, per square vard 280.00 $20.25 $5,670.00 $22.30 $6,244.00 15. Approx. 3,075 square yards of 3 1/4" asphaltic concrete transition, with base, complete as specified, per square yard 3,075.00 $20.45 $62,883.75 $21.50 $66,112.50 16. Approx. 480 square yards of 5" asphaltic concrete transition, with base, complete as specified, per square yard 480.00 $22.90 $10,992.00 $24.00 $11,520.00 17. Furnish and install approx. 9,065 tons of crushed stone base course, complete as specified, oer ton 9,065.00 $6.85 $62,095.25 $8.50 $77,052.50 2 BID TABULATION Contract 05-05 Concrete Paving/Utility Project BIDDERS Name: Vinton Construction Company Dorner, Inc. Address: P. O. Box 1987 E506 Luxemburg Road Address: P. O. Box 129 Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221~1987 Luxemburg, WI 54217-0129 Bid Time: 10:00 a.m. Phone #: Item Description Units Unit Price Unit Total Unit Price Unit Total 18. Approx. 2,725 linear feet of sawing, complete as specified, per linear foot 2,725.00 $2.00 $5,450.00 $1,80 $4,905.00 19. Furnish and install approx. 525 pavement ties (epoxy coated), complete as specified, each 525.00 $7.00 $3,675.00 $7.70 $4,042.50 20. Adjust approx. 287 manholes and inlets, comolete as specified, each 287.00 $200.00 $57,400.00 $260.00 $74,620.00 21. No Bid Item 0.00 $0.00 $0.00 22. Furnish and install approx. 12 trees, complete as specified, each 12.00 $225.00 $2,700.00 $230.00 $2,760.00 23. Remove approx. 303 I.D. of trees and stumps, complete as specified, loer inch diameter 303.00 $25.00 $7,575.00 $25.00 $7,575.00 24. Furnish and install approx. 1,000 linear feet of 3" schedule 40 PVC electrical conduit, complete as specified, per linear foot 1,000.00 $5.25 $5,250.00 $5.35 $5,350.00 25. Furnish and install approx. 250 linear feet of 3" schedule 80 PVC electrical conduit, complete as specified, per linear foot 250.00 $6.00 $1,500.00 $6.15 $1,537.50 26. Furnish and install one (1) 24" x 36" CMP pull box, w/frame and lid, comolete as soecified, lump sum 1.00 $450.00 $450.00 $460.00 $460.00 27. Terrace work on Baldwin Avenue, comolete as soecified, lump sum 1.00 $2,500.00 $2,500.00 $5,850.00 $5,850.00 28. Terrace work on W. Fernau Avenue, complete as specified, lump sum 1.00 $9,000.00 $9,000.00 $28,000.00 $28,000.00 29. Terrace work on Fernau Court, complete as specified, lump sum 1.00 $2,500.00 $2,500.00 $11,300.00 $11,300.00 30. Terrace work on Florida Avenue, complete as specified, lump sum 1.00 $4,000.00 $4,000.00 $6,900.00 $6,900.00 31. Terrace work on Franklin Street, comolete as soecified, lump sum 1.00 $4,000.00 $4,000.00 $7,550.00 $7,550.00 3 BID TABULATION Contract 05-05 Concrete Paving/Utility Project BIDDERS Name: Vinton Construction Company Dorner, Inc. Address: P. O. Box 1987 E506 Luxemburg Road Address: P. O. Box 129 Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129 Bid Time: 10:00 a.m. Phone #: Item Description Units Unit Price Unit Total Unit Price Unit Total 32. Terrace work on Frederick Street, (includes any necessary restoration on Scott Avenue) complete as specified, lumo sum 1.00 $2,000.00 $2,000.00 $2,500.00 $2,500.00 33. Terrace work on Georgia Street, complete as specified, lump sum 1.00 $3,000.00 $3,000.00 $7,000.00 $7,000.00 34. Terrace work on Iowa Street, complete as specified, lump sum 1.00 $4,000.00 $4,000.00 $7,250.00 $7,250.00 35. Terrace work on W. Irving Avenue, complete as soecified, lumo sum 1.00 $4,000.00 $4,000.00 $5,350.00 $5,350.00 36. Terrace work on W. Lincoln Avenue, complete as specified, lumo sum 1.00 $1,000.00 $1,000.00 $1,200.00 $1,200.00 37. Terrace work on W. Melvin Avenue, complete as specified, lumo sum 1.00 $1,000.00 $1,000.00 $1,400.00 $1,400.00 38. Terrace work on Otter Avenue, complete as specified, lump sum 1.00 $3,800.00 $3,800.00 $4,350.00 $4,350.00 39. No Bid Item 0.00 $0.00 $0.00 40. No Bid Item 0.00 $0.00 $0.00 41. Terrace work on Powers Street, complete as specified, lump sum 1.00 $2,000.00 $2,000.00 $3,300.00 $3,300.00 42. Terrace work on W. 19th Avenue, complete as specified, lump sum. 1.00 $2,000.00 $2,000.00 $4,250.00 $4,250.00 43. Provide $375.00 to the City of Oshkosh for project management communications, complete as specified, lumo sum 1.00 $375.00 $375.00 $375.00 $375.00 SUB.TOTAL: SECTION 1.(Bid Items 1 - 43) $2,201,413.35 $2,330,698.00 SECTION II . STORM SEWER 44. Furnish and install approx. 3,700 linear feet of 12" Storm Sewer, complete as specified, per linear foot 3,700.00 $35.75 $132,275.00 $38.00 $140,600.00 4 BID TABULATION Contract 05-05 Concrete Pavina/Utilitv Project BIDDERS Name: Vinton Construction Company Dorner, Inc. Address: P.O.Box1987 E506 Luxemburg Road Address: P. O. Box 129 Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129 Bid Time: 10:00 a.m. Phone #: Item Descriotion Units Unit Price Unit Total Unit Price Unit Total 45. Furnish and install approx. 470 linear feet of 12" RCP Class III Storm Sewer, complete as specified, per linear foot 470.00 $38.50 $18,095.00 $37.00 $17,390.00 46. Furnish and install approx. 2,550 linear feet of 15" Storm Sewer, complete as specified, per linear foot 2,550.00 $34.75 $88,612.50 $36.00 $91,800.00 47. Furnish and install approx. 290 linear feet of 18" Storm Sewer, complete as specified, per linear foot 290.00 $37.50 $10,875.00 $48.00 $13,920.00 48. Furnish and install approx. 193 linear feet of 18" RCP Class III Storm Sewer, complete as specified, per linear foot 193.00 $48.35 $9,331.55 $50.00 $9,650.00 49. Furnish and install approx. 239 linear feet of 24" Storm Sewer, complete as specified, per linear foot 239.00 $48.00 $11,472.00 $50.00 $11,950.00 50. Furnish and install approx. 73 linear feet of 33" RCP Class III Storm Sewer, complete as specified, per linear foot 73.00 $185.00 $13,505.00 $170.00 $12,410.00 51. Furnjsh and install approx. 15 linear feet of 36" RCP Class III Storm Sewer, complete as specified, per linear foot 15.00 $370.00 $5,550.00 $313.00 $4,695.00 52. Furnish and install approx. 84 std. Inlets (Type 3 with 18" sump) with castings, complete as specified, each 84.00 $1,250.00 $105,000.00 $1,250.00 $105,000.00 53. Furnish and install approx. four (4) modified Type 3 Inlets (w/o sump) with castings, complete as specified, each 4.00 $1,700.00 $6,800.00 $1,860.00 $7,440.00 5 BID TABULATION Contract 05-05 Concrete Paving/Utility Proiect BIDDERS Name: Vinton Construction Company Dorner, Inc. Address: P. O. Box 1987 E506 Luxemburg Road Address: P. O. Box 129 Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129 Bid Time: 10:00 a.m. Phone #: Item Description Units Unit Price Unit Total Unit Price Unit Total 54. Furnish and install approx. 119.00 vertical feet of std. Storm Manhole (4' Inside Diameter) in 40 locations without castings, complete as soecified, oer vertical foot 119.00 $335.00 $39,865.00 $330.00 $39,270.00 55. Furnish and install approx. 26.00 vertical feet of std. Storm Manhole (5' Inside Diameter) in seven (7) locations without castings, complete as specified, per vertical foot 26.00 $470.00 $12,220.00 $415.00 $10,790.00 56. Furnish and install approx. 16.60 vertical feetof std. Storm Manhole (6' Inside Diameter) in four (4) locations without castings, complete as specified, per vertical foot 16.60 $430.00 $7,138.00 $450.00 $7,470.00 57. Furnish and install approx. 4.40 vertical feet of std. Storm Inlet Manhole (4' Inside Diameter) in one (1) location with casting, complete as specified, oer vertical foot 4.40 $350.00 $1,540.00 $600.00 $2,640.00 58. Reconstruct approx. four (4) Storm Manhole, complete as specified, each 4.00 $990.00 $3,960.00 $800.00 $3,200.00 59. Reconstruct approx. two (2) Storm Box Inlet Manhole with casting, complete as specified, each 2.00 $2,200.00 $4,400.00 $1,640.00 $3,280.00 60. Reconstruct approx. one (1) Storm Box Manhole, complete as specified, each 1.00 $2,100.00 $2,100.00 $1,300.00 $1,300.00 61. Rebuild approx. 3.40 vertical feet of Storm Inlet Manhole (4' Inside - Diameter) in one (1) location with base with casting, complete as soecified, oer vertical foot 3.40 $500.00 $1,700.00 $650.00 $2,210.00 6 BID TABULATION Contract 05-05 Concrete PavinQ/Utilitv Project BIDDERS Name: Vinton Construction Company Dorner, Inc. Address: P. O. Box 1987 E506 Luxemburg Road Address: P. O.Box 129 Bid Date: Tuesday, May 3, 2005 ,Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129 Bid Time: 10:00 a.m. Phone #: Item Description Units Unit Price Unit Total Unit Price Unit Total 62. Rebuild approx. 3.50 vertical feet of Storm Inlet Manhole (5' Inside Diameter) in one (1) location with base with casting, complete as soecified, per vertical foot 3.50 $620.00 $2,170.00 $800.00 $2,800.00 63. Rebuild approx. 14.50 vertical feet of Storm Manhole (4' Inside Diameter) in four (4) locations, with base, complete as specified, per vertical foot 14.50 $470.00 $6,815.00 $385.00 $5,582.50 64. Rebuild approx. 4.30 vertical feet of Storm Manhole (5' Inside Diameter) in one (1) locations, with base, complete as specified, per vertical foot 4.30 $575.00 $2,472.50 $450.00 $1,935.00 65. Rebuild approx. 7.60 vertical feet of Storm Manhole (6' Inside Diameter) in one (1) location, with base, complete as specified, per vertical foot 7.60 $480.00 $3,648.00 $550.00 $4,180.00 66. Furnish and install approx. 242 6" Storm Laterals, complete as specified, each 242.00 $870.00 $210,540.00 $715.00 $173,030.00 67. Furnish and install approx. three (3) Neenah R-3067 Inlet casting w/diagonal grate, complete as specified, each 3.00 $425.00 $1,275.00 $870.00 $2,610.00 68. Abandon approx. 84 Inlets or Manholes, complete as specified, each 84.00 $250.00 $21,000.00 $360.00 $30,240.00 69. Furnish, install and maintain Type "C" Inlet Protection in 204 locations, complete as specified, each . 204.00 $35.00 $7,140.00 $50.00 $10,200.00 7 BID TABULATION Contract 05-05 Concrete Paving/Utility Project BIDDERS Name: Vinton Construction Company Dorner, Inc. Address: P. O. Box 1987 E506 Luxemburg Road Address: P. O. Box 129 Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129 Bid Time: 10:00 a.m. Phone#: Item Description Units Unit Price Unit Total Unit Price Unit Total 70. Provide $375.00 to the City of Oshkosh for project management communications, complete as soecified, fume sum 1.00 $375.00 $375.00 $375.00 $375.00 SUB.TOTAL: SECTION II. (Bid Items 44 - 70) $729,874.55 $715,967.50 SECTION III . SANITARY SEWER 71. Furnish and install approx. 5,900 linear feet of 8" Sanitary Sewer (Relay/New), complete as specified, per linear foot 5,900.00 $51.25 $302,375.00 $60.00 $354,000.00 72. Furnish and install approx. 2,590 linear feet of 10" Sanitary Sewer Relay, complete as specified, per linear foot 2,590.00 $61.25 $158,637.50 $70.00 $181,300.00 73. Furnish and install approx. 360 linear feet of 12" Sanitary Sewer (New) with Natural Backfill (through South Park), complete as specified, per linear foot 360.00 $45.50 $16,380.00 $64.00 $23,040.00 74. Furnish and install approx. 2,375 linear feet of 12" Sanitary Sewer Relay with Gravel Backfill, complete as specified, oer linear foot 2,375.00 $63.95 $151,881.25 $80.00 $190,000.00 75. Furnish and install approx. 420 linear feet of 15" Sanitary Sewer Relay (Ohio Street), complete as specified, per linear foot 420.00 $78.75 $33,075.00 $91.00 $38,220.00 76. Furnjsh and install approx. 925 linear feet of 18" Sanitary Sewer Relay, complete as specified, per linear foot 925.00 $85.00 $78,625.00 $90.00 $83,250.00 77. Excavate approx. 150 cubic yards of rock, complete as specified, per cubic yard 150.00 $120.00 $18,000.00 $150.00 $22,500.00 8 BID TABULATION Contract 05.05 Concrete Paving/Utility Project BIDDERS Name: Vinton Construction Company Dorner, Inc. Address: P. O. Box 1987 E506 Luxemburg Road . Address: P. O. Box 129 Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129 Bid Time: 10:00 a.m. Phone #: Item Description Units Unit Price Unit Total Unit Price Unit Total 78. Furnish and install approx. 448 vertical feet of std. Sanitary Manhole (4' Inside Diameter) in 65 locations, complete as specified, without casting, per vertical foot 448.00 $175.00 $78,400.00 $170.00 $76,160.00 79. Reconstruct approx. two (2) Sanitary Manhole, complete as specified, each 2.00 $850.00 $1,700.00 $650.00 $1,300.00 80. Reconnect approx. 16 Sanitary Laterals, complete as specified, each 16.00 $316.00 $5,056.00 $310.00 $4,960.00 81. Furnish and install approx. 5,720 linear feet of 6" Sanitary Lateral New/Relay, complete as specified, per linear foot 5,720.00 $42.00 $240,240.00 $44.00 $251,680.00 82. Remove (existing asphalt over concrete) and replace (with five (5") inches of asphalt) approx. 350 square yards of asphalt pavement on Ohio Street, complete as specified with sawing, per square yard 350.00 $28.21 $9,873.50 $35.00 $12,250.00 83. Abandon approx. 18 Sanitary Manholes, complete as specified, each 18.00 $325.00 $5,850.00 $510.00 $9,180.00 84. Plug approx. four (4) Sanitary Sewers, complete as specified, each 4.00 $110.00 $440.00 $250.00 $1,000.00 85. Terrace work on W. South Park Avenue, through South Park and Ohio Street, complete as specified, lump sum 1.00 $3,800.00 $3,800.00 $4,400.00 $4,400.00 86. Provide $375.00 to the City of Oshkosh for project management communications, complete as specified, lump sum 1.00 $375.00 $375.00 $375.00 $375.00 9 BID TABULATION Contract OS-OS Concrete Paving/Utility Project BIDDERS Name: Vinton Construction Company Dorner, Inc. Address: P. O. Box 1987 E506 Luxemburg Road Address: P. O. Box 129 Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129 Bid Time: 10:00 a.m. Phone #: Item Description Units Unit Price Unit Total Unit Price Unit Total SUB-TOTAL: SECTION III. (Bid Items 71 - 86) $1,104,708.25 $1,253,615.00 SECTION IV - WATER MAIN 87. Furnish and install approx. 15 linear feet of 4" Ductile Iron Water Main w/poly wrap, complete as specified (fittings not included), per linear foot 15.00 $100.00 $1,500.00 $90.00 $1,350.00 88. Furnish and install approx. 415 linear feet of 6" Ductile Iron Water Main w/poly wrap, complete as specified (fittings not included), per linear foot 415.00 $70.00 $29,050.00 $70.00 $29,050.00 89. Furnish and install approx. 7,605 linear feet of 8" Ductile Iron Water Main w/poly wrap, complete as specified, (fittings not included), per linear foot 7,605.00 $60.70 $461,623.50 $55.00 $418,275.00 90. Furnish and install approx. 1,250 linear feet of 12" Ductile Iron Water Main w/poly wrap, complete as specified (fittings not included), per linear foot 1,250.00 $76.95 $96,187.50 $60.00 $75,000.00 91. No Bid Item 0.00 $0.00 $0.00 92. Excavate approx. 75 cubic yards of rock, complete as specified, per cubic Ivard 75.00 $120.00 $9,000.00 $150.00 $11,250.00 93. Lower existing 8" Water Main at W. Melvin Avenue/Frederick Street intersection, lump sum 1.00 $4,300.00 $4,300.00 $5,300.00 $5,300.00 94. Reconnect approx. ten (10), 1" - 1 1/4" Water Services, complete as specified,each 10.00 $425.00 $4,250.00 $525.00 $5,250.00 10 BID TABULATION Contract 05-05 Concrete Paving/Utility Project BIDDERS Name: Vinton Construction Company Dorner, Inc. Address: P. O. Box 1987 E506 Luxemburg Road Address: P. O. Box 129 Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129 Bid Time: 10:00 a.m. Phone #: Item Descriotion Units Unit Price Unit Total Unit Price Unit Total 95. Furnish and install approx. 4,825 linear feet of 1" Water Service (Relay/New), complete as specified, not including corporation and stop box, per linear foot 4,825.00 $31.00 $149,575.00 $36.00 $173,700.00 96. Furnish and install approx. 214, 1" corporation and stop box with rod, complete as specified, each 214.00 $250.00 $53,500.00 $465.00 $99,510.00 97. Relay 2" Water Service to 761 Florida Avenue (Wesley Methodist Church), complete as specified with new stop box, lump sum 1.00 $1,665.00 $1,665.00 $1,500.00 $1,500.00 98. Furnish and install approx. one (1), 8" Plug, complete as specified, each 1.00 $85.00 $85.00 $90.00 $90.00 99. No Bid Item 0.00 $0.00 $0.00 100. No Bid Item 0.00 $0.00 $0.00 101. No Bid Item 0.00 $0.00 $0.00 102. Furnish and install approx. 21, 8" x 6" Tees, complete as specified, each 21.00 $271.00 $5,691.00 $305.00 $6,405.00 103. Furnish and install approx. five (5), 8" x 8" Tees, complete as specified, each 5.00 $260.00 $1,300.00 $285.00 $1,425.00 104. Furnish and install approx. five (5), 12" x 6" Tees, complete as specified, each 5.00 $427.00 $2,135.00 $550.00 $2,750.00 105. Furnish and install approx. six (6), 12" x 8" Tees, complete as specified, each 6.00 $395.00 $2,370.00 $510.00 $3,060.00 106. Furnish and install approx. four (4), 18" x 6" Tees, complete as specified, each 4.00 $1.00 $4.00 $0.00 $0.00 107. Furnish and install approx. three (3), 8" x 4" Reducers, complete as soecified,each 3.00 $125.00 $375.00 $150.00 $450.00 11 BID TABULATION Contract 05-05 Concrete Pavinq/Utilitv Project BIDDERS Name: Vinton Construction Company Dorner, Inc. Address: P. O. Box 1987 E506 Luxemburg Road Address: P. O. Box 129 Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129 Bid Time: 10:00 a.m. Phone #: Item Description Units Unit Price Unit Total Unit Price Unit Total 108. Furnish and install approx. 15, 8" x 6" Reducers, complete as soecified, each 15.00 $150.00 $2,250.00 $165.00 $2,475.00 109. Furnish and install approx. one (1) 12" x 8" Reducer, complete as specified, each 1.00 $260.00 $260.00 $250.00 $250.00 110. Furnish and install approx. one (1), 8" x 8" Cross, complete as specified, each 1.00 $342.75 $342.75 $385.00 $385.00 111. No Bjd Item 0.00 $0.00 $0.00 112. Furnish and install approx. three (3), 6" - 11.25 degree Bends, comolete as specified, each 3.00 $225.00 $675.00 $150.00 $450.00 113. Furnish and install approx. six (6), 4" - 45 degree Bends, complete as specified, each 6.00 $190.00 $1,140.00 $120.00 $720.00 114. Furnish and install approx. 32, 6" - 45 degree Bends, complete as specified, each 32.00 $200.00 $6,400.00 $155.00 $4,960.00 115. Furnish and install approx. 18, 8" - 45 degree Bends, complete as specified, each 18.00 $230.00 $4,140.00 $190.00 $3,420.00 116. Furnish and install approx. six (6), 12" - 45 degree Bends, complete as specified, each 6.00 $370.00 $2,220.00 $340.00 $2,040.00 117. No Bid Item 0.00 $0.00 $0.00 118. No Bid Item 0.00 $0.00 $0.00 119. Furnish and install approx. 25, 6" Valves, complete as specified, each 25.00 $660.00 $16,500.00 $655.00 $16,375.00 120. Furnish and install approx. 21, 8" Valves, complete as specified, each 21.00 $870.00 $18,270.00 $880.00 $18,480.00 12 BID TABULATION Contract 05-05 Concrete Paving/Utility Project BIDDERS Name: Vinton Construction Company Dorner, Inc. Address: P. O. Box 1987 E506 Luxemburg Road Address: P. O. Box 129 Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129 Bid Time: 10:00 a.m. Phone #: . Item Description Units Unit Price Unit Total Unit Price Unit Total 121. Furnish and install approx. three (3), 12" Valves in Std. Water Valve Manhole, complete as specified, each 3.00 $3,850.00 $11,550.00 $3,700.00 $11,100.00 . 122. No Bid Item 0.00 $0.00 $0.00 123. Furnish and install approx. nine (9), 6" x 6" Tapping Valves and Sleeves, complete as soecified, each 9.00 $1,500.00 $13,500.00 $2,150.00 $19,350.00 124. Furnish and install approx. one (1), 8" x 8" Tapping Valves and Sleeves, complete as specified, each 1.00 $1,700.00 $1,700.00 $2,700.00 $2,700.00 125. Furnish and install approx. three (3), 12" x 6" Tapping Valves and Sleeves, complete as specified, each 3.00 $1,600.00 $4,800.00 $2,800.00 $8,400.00 126. Reconstruct approx. one (1) Std. Water Valve Manhole, complete as specified, each 1.00 $1,500.00 $1,500.00 $1,160.00 $1,160.00 127. Furnish and install approx. 23 Hydrants, complete as specified, each 23.00 $1,850.00 $42,550.00 $1,750.00 $40,250.00 128. Abandon 6" Water Main on Baldwin Avenue, complete as specified, lump " sum 1.00 $2,000.00 $2,000.00 $3,500.00 $3,500.00 129. Abandon 6" Water Main on Florida Avenue, complete as specified, lump sum 1.00 $2,000.00 $2,000.00 $3,000.00 $3,000.00 130. Abandon 6" Water Main on Franklin Street, complete as specified, lump sum 1.00 $1,200.00 $1,200.00 $5,000.00 $5,000.00 131. Abandon 6" Water Main on Frederick Street, complete as specified, lump sum 1.00 $2,000.00 $2,000.00 $3,000.00 $3,000.00 132. Abandon 6" Water Main on Georgia Street, complete as specified, lump sum 1.00 $3,000.00 $3,000.00 $5,000.00 $5,000.00 13 BID TABULATION Contract 05-05 Concrete PavinQ/Utilitv Project BIDDERS Name: Vinton Construction Company Dorner, Inc. Address: P. O. Box 1987 E506 Luxemburg Road Address: P. O. Box 129 Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129 Bid Time: 10:00 a.m. Phone #: Item Description Units Unit Price Unit Total Unit Price Unit Total 133. Abandon 6" Water Main on Iowa Street, complete as specified, lump sum 1.00 $2,800.00 $2,800.00 $4,500.00 $4,500.00 134. Abandon 8" Water Main on W. Irving Avenue, complete as specified, lump sum 1.00 $1,020.00 $1,020.00 $4,500.00 $4,500.00 135. Abandon 6" Water Main on W. Lincoln Avenue, complete as specified, lump sum 1.00 $1,020.00 $1,020.00 $1,500.00 $1,500.00 136. Abandon 6" Water Main on W. Melvin Avenue, complete as specified, lump sum 1.00 $1,000.00 $1,000.00 $1,500.00 $1,500.00 137. Abandon 6" Water Main on Otter Avenue, complete as specified, lump sum 1.00 $1,500.00 $1,500.00 $4,000.00 $4,000.00 138. No Bid Item 0.00 $0.00 $0.00 $0.00 139. Abandon 6" Water Main on Powers Street, complete as specified, lump sum 1.00 $1,340.00 $1,340.00 $1,500.00 $1,500.00 140. Abandon 6" Water Main on W. 19th Avenue, complete as specified, lump sum 1.00 $1,500.00 $1,500.00 $2,000.00 $2,000.00 141. Provide $375.00 to the City of Oshkosh for project management communications, complete as specified, lump sum 1.00 $375.00 $375.00 $375.00 $375.00 SUB-TOTAL: SECTION IV - (Bid Items 87 -141 $971,163.75 $1,006,255.00 I TOTAL CONTRACT 05-05 (Part I) - (Bid Items 1 -141) $5,007,159.90 $5,306,535.50 CONTRACT 05-05 (Part II) Southwest Industrial Park - Global Parkway Extension 14 BID TABULATION Contract 05-05 Concrete PavinQ/Utility Project BIDDERS Name: Vinton Construction Company Dorner, Inc. Address: P. O. Box 1987 E506 Luxemburg Road Address: P. O. Box 129 Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129 Bid Time: 10:00 a.m. Phone #: Item Description Units Unit Price Unit Total Unit Price Unit Total Item Description Units UnitTotal Unjt Price Unit Total Part II SECTION I - STREET WORK 1. Excavate approx. 750 cubic yards for roadway, complete as specified, per cubic vard 750.00 $3.50 $2,625.00 $7.18 $5,385.00 2. Furnish and install approx. 2,500 tons of crushed stone base course, comolete as soecified, per ton 2,500.00 $7.15 $17,875.00 $8.05 $20,125.00 3. Terrace work on the Global Parkway, complete as specified, lump sum 1.00 $5,300.00 $5,300.00 $5,650.00 $5,650.00 4. Allowance for project management communication, lump sum 1.00 $375.00 $375.00 $375.00 $375.00 SUB-TOTAL: SECTION 1- (Bid Items 1 - 4) $26,175.00 $31,535.00 SECTION II - STORM SEWER 5. Furnish and install approx. 90 linear feet of 12" RCP Class III or PVC Storm Sewer with natural backfill, complete as specified, per linear foot 90.00 $32.55 $2,929.50 $25.00 $2,250.00 6. Furnish and install approx. 230 linear feet of 15" RCP Class III or PVC Storm Sewer with natural backfill, complete as specified, per linear foot 230.00 $28.20 $6,486.00 $25.00 $5,750.00 7. Furnish and install approx. 15 linear feet of 18" RCP Class III or PVC Storm Sewer with natural backfill, complete as specified, per linear foot 15.00 $41.00 $615.00 $73.00 $1,095.00 15 BID TABULATION Contract 05-05 Concrete Paving/Utility Project BIDDERS Name: Vinton Construction Company Dorner, Inc. Address: P. O. Box 1987 E506 Luxemburg Road Address: P. O. Box 129 Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129 Bid Time: 10:00 a.m. Phone #: Item Description Units Unit Price Unit Total Unit Price Unit Total 8. Furnish and install approx. 250 linear feet of 30" RCP Class III Storm Sewer with natural backfill, complete as specified, per linear foot . 250.00 $48.55 $12,137.50 $43.00 $10,750.00 9. Furnish and install approx. 270 linear feet of 36" RCP Class III Storm Sewer with natural backfill, complete as specified, per linear foot 270.00 $68.60 $18,522.00 $56.00 $15,120.00 10. Furnish and install approx. 40 linear feet of 42" RCP Class IV Storm Sewer with natural backfill, complete as specified, per linear foot 40.00 $90.00 $3,600.00 $82.00 $3,280.00 11. Furnish and install approx. 200 linear feet of 48" RCP Class IV Storm Sewer with natural backfill, complete as specified, per linear foot 200.00 $98.45 $19,690.00 $85.00 $17,000.00 12. Furnish and install approx. 90 linear feet of 76" x 48" RCP HE Class IV Storm Sewer with natural backfill, complete as specified, per linear foot 90.00 $196.45 $17,680.50 $188.00 $16,920.00 13. Furnish and install approx. six (6) Type 3 Standard Inlet with 18" sump with casting, complete as specified, each 6.00 $1,100.00 $6,600.00 $1,150.00 $6,900.00 14. Furnish and install approx 17 vertical feet of 6' Diameter Storm Manhole with casting, complete as specified, per vertical foot 17.00 $500.00 $8,500.00 $630.00 $10,710.00 15. Furnish and install approx six (6) vertical feet of 8' Diameter Storm Manhole with casting, complete as specified, per vertical foot 6.00 $676.80 $4,060.80 $800.00 $4,800.00 16 BID TABULATION Contract 05-05 Concrete Paving/Utility Proiect BIDDERS Name: Vinton Construction Company Dorner, Inc. Address: P. O. Box 1987 E506 Luxemburg Road / Address: P. O. Box 129 Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129 Bid Time: 10:00 a.m. Phone #: Item Description Units Unit Price Unit Total Unit Price Unit Total 16. Furnish and install approx. one (1) 30" RCP Endwall, complete as specified, each 1.00 $1,560.00 $1,560.00 $700.00 $700.00 17. Furnish and install approx. one (1) 42" RCP Endwall, complete as specified, each 1.00 $2,165.00 $2,165.00 $1,250.00 $1,250.00 18. Furnish and install approx. one (1) 48" RCP Endwall, complete as specified, each 1.00 $2,425.00 $2,425.00 $1,350.00 $1,350.00 19. Furnish and install approx. two (2) 76" x 48" RCP Endwalls, complete as specified, each 2.00 $5,165.00 $10,330.00 $2,900.00 $5,800.00 20. Allowance for project management communication, lump sum 1.00 $375.00 $375.00 $375.00 $375.00 SUB-TOTAL: SECTION II- (Bid Items 5 - 20) $117,676.30 $104,050.00 SECTION III - WATER MAIN 21. Furnish and install approx. 50 linear feet of 6" Ductile Iron Water Main with natural backfill and poly wrap. complete as specified, per linear foot 50.00 $34.95 $1,747.50 $30.00 $1,500.00 22. Furnish and install approx. 820 linear feet of 10" Ductile Iron Water Main with natural backfill and polv wrap. complete as specified, per linear foot 820.00 $40.00 $32,800.00 $33.00 $27,060.00 23. Furnish and install approx. one (1) 5' Diameter Valve and Air Release Manhole on a 10" diameter water main, complete as specified, each 1.00 $3,924.00 $3,924.00 $4,050.00 $4,050.00 24. Furnish and install approx. two (2) 10" x 6" Tee, complete as specified, each 2.00 $310.00 $620.00 $325.00 $650.00 17 BID TABULATION Contract OS-OS Concrete Paving/Utility Project BIDDERS Name: Vinton Construction Company Dorner, Inc. Address: P. O. Box 1987 E506 Luxemburg Road Address: P. O. Box 129 Bid Date: Tuesday, May 3, 2005 Address: Manitowoc, WI 54221-1987 Luxemburg, WI 54217-0129 Bid Time: 10:00 a.m. Phone #: Item Description Units Unit Price Unit Total Unit Price Unit Total 25. Furnish and install approx. one (1) 10" x 6" Reducer, complete as specified, each 1.00 $200.00 $200.00 $180.00 $180.00 26. Furnish and install approx. one (1) 10" -111/4 degree Bend, complete as specified, each 1.00 $330.00 $330.00 $235.00 $235.00 27. Furnish and install approx. one (1) 10" - 221/2 degree Bend, complete as specified, each 1.00 $330.00 $330.00 $235.00 $235.00 28. Furnish and install approx. two (2) 6" Gate Valve and Box, complete as specified, each 2.00 $660.00 $1,320.00 $655.00 $1,310.00 29. Furnish and install approx. two (2) 10" Gate Valves and Boxes, complete as specified, each 2.00 $1,170.00 $2,340.00 $1,200.00 $2,400.00 30. Furnish and install approx. three (3) Fire Hydrants, complete as specified, each 3.00 $1,860.00 $5,580.00 $1,700.00 $5,100.00 31. Furnish and install approx. one (1) connection to existing 10" Diameter Water Main, complete as specified, each 1.00 $100.00 $100.00 $1,450.00 $1,450.00 32. Allowance for project management communication, lump sum 1.00 $375.00 $375.00 $375.00 $375.00 SUB-TOTAL: SECTION III - (Bid Items 21 - 32) $49,666.50 $44,545.00 SECTION IV - Stormwater Management/Miscellaneous 33. Excavate and grade approx. 30,500 cubic yards of stormwater management ponds, complete as specified, per cubic yard 30,500.00 $2.50 $76,250.00 $2.55 $77,775.00 34. Furnish and install approx. 100 square yards of medium Riprap, complete as specified, per square yard 100.00 $21.00 $2,100.00 $21.50 $2,150.00 18