Loading...
HomeMy WebLinkAbout0113963-Building (patio door) � CITY OF OSHKOSH No 113963 � s°A'�'y OS HE OSE BUILDING PERMIT -APPLICATION AND RECORD .w��� 0 Job Address 1210 GROVE ST Owner GARETH G/JENNIF ANGELL Cr 05/09/2005 Designer Contractor OWNER Category 140-Interior Remodeling Plan Type � Building 0 Sign _ � Canopy � Fence 0 Raze ' - _ - __ —-----� , Zoning Class of Const: Size Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. ❑ Projection i Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq.Ft. Baths 0 Signs 0 Foundation � Poured Concrete � FloaUng Slab � Pier � Other � Concrete Block � Post 0 Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 ---- ----- ---- ----- ---- __---- - Use/Nature FR/Installing a 6'patio door. A new header will be installed to carry all the loads imposed. Code compiiant steps will be provided off of Work he door. A separate electrical and deck permit will be obtained in the future. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuati $2,200.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Issued By: Date 05/09/2005 Final/O.P. 00/00/0000 � Permit Voided Parcel Id# 1510200000 In the perFormance of this work 1 agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perForm the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement hoider(s)and t secure ny n cessary approvals ore starting such activity. Signatur Date ...> 9 d.�J AgenUOwner � Address 1210 GROVE ST OSHKOSH WI 54901 -4053 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address,Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.