HomeMy WebLinkAbout2005-Building (roof)
e
OSHKOSH
ON THE WATER
Job Address 319 N SAWYER ST
CITY OF OSHKOSH
No
113800
BUILDING PERMIT - APPLICATION AND RECORD
Owner
RICHARD/VIRGINI NASLUND REV TRUST
Create Date
05/02/2005
Designer
Contractor
CARDINAL COMMERCIAL ROOFING
Category
232 - Alteration Stores & Customer Service
Plan
Type
I. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~ Sq. Ft. Bedrooms 0 Stories
Garage ~ Sq. Ft. Baths 0
U Projection 1
Canopies
0
Signs
0
Foundation
0 Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
. Other
Occupancy Permit
Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
0
# Structures
0
319- 331 N Sawyer - Reroof - Install new durolast adhered membrane roof, install new 1" board insulation under membrane.
Use/Nature
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$25,000.00
Plan Approval
$0.00 Permit Fee Paid
$139.00 Park Dedication
$0.00
Issued By:
Date 05/02/2005
Final/O.P. 00/00/0000
U Permit Voided 1
Parcelld # 1610750100
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
301 N SAWYER ST
Agent/Owner
OSHKOSH
WI 54902 - 4252 Telephone Number
CONDO UNIT
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.