HomeMy WebLinkAbout0113792-Building (fence)
e
OSHKOSH
ON THE WATER
Job Address 1471 PHEASANT CREEK DR
CITY OF OSHKOSH
No
113792
BUILDING PERMIT - APPLICATION AND RECORD
Owner
TIMOTHY R EATON/JILL M LUEBKE
Create Date
05/02/2005
Designer
Contractor
OWNER
Category
251 - Fences
Plan
Type
10 Building
0 Sign
0 Canopy . Fence 0 Raze
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
Size
Zoning
Unfinished/Basement
0 Sq.Ft.
~ Sq. Ft.
U Projection I
Finished/Living
Canopies
0
Garage
~ Sq. Ft.
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
0
# Structures
0
SFR/ Installation of approx. 78' of 4' high chain link fence per the site plan submitted.
Use/Nature
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$1,000.00
Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Issued By:
Date 05/02/2005
Final/O.P. 00/00/0000
U Permit Voided I
Parcelld # 1343230000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
1471 PHEASANT CREEK DR
Agent/Owner
OSHKOSH
WI 54904 - 7453 Telephone Number
231-8203
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
Ido'
hI'
t\~
~(Jf()L.¿{--'
'1)" \J 4..- W ""õ
)
:)ti'
t
r-l~
6 ì k..1.Ù~
\~Ì")\ ,?~':::,~ ti.':L'è.ß- ~
L..o+ 6ìì:~= (,1' X ¡JOt
4-' h~h C~ih L.."j¿ ~
bsf.'rn():h!. e.æ+: /~c/X).-