Loading...
HomeMy WebLinkAbout0113782-Building (fence) e OSHKOSH ON THE WATER Job Address 1027 ARTH U R AVE CITY OF OSHKOSH No 113782 BUILDING PERMIT - APPLICATION AND RECORD Owner JAMES E/MELISSA MCLAUGHLIN JR Create Date 04/29/2005 Designer Contractor OWNER Category 251 - Fences Plan Type 10 Building 0 Sign 0 Canopy . Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~ Sq. Ft. Bedrooms 0 Stories Garage ~ Sq. Ft. Baths 0 U Projection I Canopies 0 Signs 0 Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block. Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 SFR/ Install 20 lin ft of 5' tall privacy fence, 48 lin ft of 6' tall privacy fence and 61 lin ft of 4' tall privacy fencing in rear yard. Also install a 10x12 patio block patio. Use/Nature of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $3,500.00 Plan Approval $0.00 Permit Fee Paid $38.00 Park Dedication $0.00 Issued By: Date 04/29/2005 Final/O.P. 00/00/0000 U Permit Voided I Parcelld # 1607530000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1027 ARTHUR AVE Agent/Owner OSHKOSH WI 54902 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.